This system will be undergoing maintenance March 20th between 9:00AM and 12:00PM CDT.

Search Results

Primary view of A 1.5 Mwe Thermionic Reactor Space Power System
Smith, C. K. & Parkinson, R. Y.
October 31, 1966
Primary view of 04 nuclear safety: pressure piping crack monitoring detection of metal overstress by acoustic emission. Progress report, July-September 1966
Hutton, P H
October 28, 1966
Primary view of 9-ANGIE : a Two-Dimensional, Multigroup, Neutron-Diffusion-Theory Reactor Code for the IBM 709 or 7090
Stone, Stuart P.
October 28, 1960
Primary view of 12-INCH SODIUM FLOW CONTROLLER. Technical Manual 20357
unknown creator
October 31, 1962
Primary view of 40-MW(e) Prototype High-Temperature Gas-Cooled Reactor Research and Development Program. Quarterly Progress Report for the Period Ending June 30, 1962
unknown creator
October 31, 1963
Primary view of 40-Mw(E) Prototype High-Temperature Gas-Cooled Reactor. Research and Development Program. Quarterly Progress Report for the Period Ending March 31, 1963
unknown creator
October 31, 1964
Primary view of 710 Mockup No. 1 critical experiment. Summary data report
Sims, F. L.; Kunze, J. F.; Pincock, G. D. & Chase, P. L.
October 21, 1966
Primary view of 10th Annual Bio-Assay and Analytical Chemistry Meeting, October 8-9, 1964
unknown creator
October 31, 1966
Primary view of 1961 Salmon Survey
unknown creator
October 31, 1965
Primary view of ABSORPTION CHANGES IN BACTERIAL CHROMATOPHORES. II. A NEWCHLOROPHYLL-LIKE PIGMENT FROM THE OXIDATION OF CHROMATOPHORES FROMRHODOSPIRILLUM RUBRUM
Gould, Edwin S.; Kuntz Jr., Irwin D. & Calvin, Melvin
October 1, 1964
Primary view of ABWR: PL-2 Design Report
Combustion Engineering, inc. Nuclear Division.
October 15, 1960
Primary view of ABWR Design and Development Quarterly Progress Report: July 1 - September 30, 1961
Combustion Engineering, inc. Nuclear Division.
October 16, 1961
Primary view of Acceptance Of Foreign Gifts By Members Of Congress, 1968
Spier, Jill
October 17, 1968
Primary view of Acceptance test facility safeguards report
Soske, P. L.; Ostenso, A. S. & Kamensky, F. J.
October 1, 1962
Primary view of Accidental Radiogold (198Au) Liver Scan Overdose With Fatal Outcome
Baron, J.M.; Yachnin, S.; Polcyn, R.; Fitch, F.W. & Sturner, W.G.
October 31, 1969
Primary view of Accurate Nuclear Fuel Burnup Analyses: Third Quarterly Progress Report June - August, 1962
Rider, B. F.
October 1, 1962
Primary view of Activities of the Cross-Section Compilation and Evaluation Centers at the Brookhaven National Laboratory.
Chernick, J.
October 31, 1967
Primary view of Activity Coefficients of Various Electrolytes. Molal and Molar Concentrations
Gazith, M. comp.
October 1, 1964
Primary view of Activity Release From the N.S. Savannah in the Maximum Credible Accident
Anderson, T. D.; Buchanan, J. R.; Cottrell, W. B.; Fontana, M. H.; Klepper, O. H. & McCurdy, H. C.
October 16, 1963
Primary view of ADDENDUM TO THE SPERT III HAZARDS SUMMARY REPORT-LOW-ENRICHMENT OXIDE CORE
Houghtaling, J E; Norberg, J A & Haire, J C
October 1, 1965
Primary view of Additional Physical Property Data, U12g.01 Tunnel, Nevada Test Site, Nye County, Nev.
Emerick, W. L.; Snyder, R. F. & Hoover, D. L.
October 5, 1962
Primary view of ADDITIONAL YIELD DATA FOR TRANSPLUTONIUM ELEMENT PRODUCTION IN THERMAL REACTORS
Milsted, J.; Macias, E.S.; Basile, L.J.; Anderson, R.W. & Stewart, D.C.
October 1, 1965
Primary view of Adenosinetriphosphate Cleavage During the G-Actin to F-Actin Transformation and the Binding of Adenosinetriphosphate to F-Actin
Barany, M.; Koshland, D. E., Jr.; Springhorn, S. S.; Finkleman, F. & Theratil-Anthony, T.
October 15, 1963
Primary view of Advanced Indirect Cycle Water Reactor Studies for Maritime Applications: Part 3. Analog Simulation of Reactor Plant Transients
Combustion Engineering, inc. Nuclear Division.
October 23, 1961
Back to Top of Screen