Search Results

Primary view of The Determination of Nitrous Oxide with the Infrared Spectrometer
Moore, R. H. & Carson, W. N.
January 25, 1950
Primary view of A Recirculating Supercritical Water Loop
Epstein, H. M.; Goldthwaite, W. H.; Chastain, Joel W. & Fawcett, Sherwood L.
October 25, 1954
Primary view of A Recirculating Supercritical Water Loop
Epstein, H. M.; Goldthwaite, W. H.; Chastain, Joel W. & Fawcett, Sherwood L.
October 25, 1954
Primary view of Corrosion of Austenitic Stainless Steels in MJ-4 Raw Streams
Koenig, W. W.
April 25, 1950
Primary view of Radioactive debris from operations Tumbler and Snapper: observations beyond 200 miles from the test site. Part II
List, R.J.
February 25, 1953
Primary view of Uranium Chemistry of Raw Materials Section Progress Report for October 1, 1951 to December 31, 1951
Brown, K. B.
January 25, 1952
Primary view of Forced Convection Heat Transfer in Thermal Entrance Regions Part III. Heat Transfer to Liquid Metals
Harrison, William B.
June 25, 1954
Primary view of Corrosion Data From the ORNL Purex Pilot Plant Acid Recovery Equipment
Landry, J. W. & Ullmann, J. W.
March 25, 1952
Primary view of An Experimental Determination of Fission Product Heating After Shutdown of the Low Intensity Training Reactor
Beall, S. E.
September 25, 1951
Primary view of In-reactor corrosion of X-8001 and 1245 aluminum: Analysis of data from PT IP-42A
Dillon, R. L. & Richman, R. B.
June 25, 1958
Primary view of High Energy Fission and Spallation of Uranium
Batzel, Roger Elwood
February 25, 1954
Primary view of Production Test No. 105-522-E, Examination of pile process tubes
Falkoski, R. E.
May 25, 1953
Primary view of Analytical procedures for the plutonium Metal Fabrication Process
Bierlein, T. K.; Kendall, L. F. & Van Tuyl, H. H.
July 25, 1952
Primary view of Trajectory-Wise Analysis of Immobilized Plasma Including Electrons. Machine Calculations
Tonks, Lewi, 1897-1971 & Keirstead, Ralph
March 25, 1955
Primary view of Elimination of the Cold Outgassing for the Casting Operation : Final Report-Production Test 235-1
Carlson, R. A.
January 25, 1952
Primary view of The Abundance of the Principle Crustacea of the Columbia River and the Radioactivity They Contain
Coopey, R. W.
June 25, 1953
Primary view of Analytical Procedures for the Plutonium Metal Fabrication Process
Bierlein, T. K.; Kendall, L. F. & Van Tuyl, H. H.
July 25, 1952
Primary view of Radiological Sciences Department investigation radiation incident, Class I, No. 299
Ebright, D. P.
August 25, 1953
Primary view of Redox accountability test program: Initial results
Schneider, R. A. & Bray, L. A.
November 25, 1958
Primary view of Contaminated Equipment Renovation Shop. A Preliminary Study
Hughes, H. R.
August 25, 1955
Primary view of Steam loss at 190-B, D, DR, F, and H Buildings
Stainken, F. A. R.
February 25, 1955
Primary view of Hanford Atomic Products Operation monthly report, January 1954
McCune, F. K.
February 25, 1954
Primary view of Hanford Atomic Products Operation monthly report, December 1954
unknown creator
January 25, 1955
Primary view of Operating conditions for Pt IP-205-A, irradiation of Zircaloy-2 jacketed rod-and-tube elements in the KER Loops
Kratzer, W. K.
November 25, 1958
Back to Top of Screen