100 Area Process Water Pressure Decay Test Program: Part 1
Description:
The increase in process tube outlet water temperature to 90{degree}C resulted in increased emergency water flow requirements as indicated by recently approved curves which establish minimum crossheader pressure requirements for the first three minutes following an electrical power failure. To determine whether 190 Building secondary process water pump capacities are adequate for current minimum reactor water pressure requirements, process water pump trip-cut tests are being conducted at all rea…
more
Date:
January 2, 1953
Creator:
Thompson, P.
Partner:
UNT Libraries Government Documents Department