Search Results

Primary view of Maritime Gas-Cooled Reactor Program, Quarterly Progress Report: April-June 1961
unknown creator
July 31, 1963
Primary view of Pressure Pulses in Rapid Transient Boiling
Wright, R. W.
July 31, 1963
Primary view of EDP Procedures in Technical Library Operations
Griffin, Hillis L.
July 30, 1963
Primary view of Single Particle Excitation Theory Of The Photonuclear Giant Resonance
Buskirk, F.
July 30, 1963
Primary view of The Strain Aging and Heat Treatment Properties of N-Reactor Connector Tubes
Pessl, H. J.
July 30, 1963
Primary view of High Power Density Development Project: Potter Meter Calibration and Instrumented Fuel Bundle Pressure Drop
Polomik, E. E. & Swan, C. L.
July 26, 1963
Primary view of Gas-Cooled Reactor Project Semiannual Progress Report: March 1963
Oak Ridge National Laboratory
July 23, 1963
Primary view of Fast Neutron Interactions with Li⁶ and Li⁷
Rosen, Louis
July 18, 1963
Primary view of Feed Materials Production Center Summary Technical Report: April 1, 1963-June 30, 1963
unknown creator
July 18, 1963
Primary view of Ground-Water Test Well 2, Nevada Test Site, Nye County, Nevada: A Summary of Lithologic Data, Aquifer Tests, and Well Construction
Moore, John E.; Doyle, Alan C.; Walker, George E.; Young, Richard A. & Carroll, Roderick D.
July 18, 1963
Primary view of Development of Pulsed Neutron Application to Power Reactor Start-Up Procedures. Fifth Quarterly Progress Report, April 1-June 30, 1963
Garelis, Edward & Meyer, P.
July 15, 1963
Primary view of PM-1 Nuclear Power Plant Program: Final Progress Report, September 1, 1962 Through Completion
unknown creator
July 15, 1963
Primary view of Program for the Development of Plutonium Recycle for Use in Light Water Moderated Reactors Quarterly Progress Report: April 1 - June 30, 1963
Robkin, M. A.
July 15, 1963
Primary view of Residual and Fission Gas Release from Uranium Dioxide
Spalaris, C. N. & Megerth, F. H.
July 15, 1963
Primary view of The Design of a Dynamic Corrosion and Chemical Control Test Loop and Preliminary Out-of-Pile Test Results
Zelezny, W. F.
July 12, 1963
Primary view of Water Spectra and Energy Exchange Kernels
Daitch, Paul B. (Paul Bernard), 1925- & Ohanian, M. J.
July 11, 1963
Primary view of Process Simulation on a Digital Computer Using Analog Methods
Farris, George J. & Burkhart, Lawrence E.
July 10, 1963
Primary view of Fuel Cycle Program Progress Report: Twelfth Quarter, April-June 1963
Howard, C. L.
July 5, 1963
Primary view of Feasibility of Constructing Large Underground Cavities: Volume 3, Report on Cost and Constructability
Jacobs Associates
July 3, 1963
Primary view of Mass Systematics Involving Low-Lying Excited States
Everling, F.
July 3, 1963
Primary view of Aeroradioactivity Survey and Areal Geology of Parts of Southeastern New York and Southern New England (ARMS-I)
Popenoe, Peter
July 1963
Primary view of An Alpha Scintillation Tester for Uranium Surface Contamination of N-Reactor Fuel
Jackson, C. N., Jr.
July 1963
Primary view of Demineralization of Saline Water Through Pressurization Cycles with Ion Exchange Materials
Western Independent Research Laboratories, Inc.
July 1963
Primary view of Development and Evaluation of Soil Bearing Capacity Foundations of Structures, Report 1: Field Vibratory Tests Data
Waterways Experiment Station (U.S.)
July 1963
Back to Top of Screen