This system will be undergoing maintenance December 12th between 9:00AM and 12:00PM CST.

Search Results

Primary view of Medical imaging with coded apertures
Keto, E. & Libby, S.
June 16, 1995
Primary view of Single Bunch Stability to Monopole Excitation
Podobedov, Boris
January 19, 1999
Primary view of Neutron diffraction study of NiTi during compressive deformation and after shape-memory recovery
Dunand, D. C.; Mari, D.; Bourke, Mark A. M. & Goldstone, Joyce A.
September 1995
Primary view of Maintenance Action Work Plan for Waste Area Grouping 1 inactive tanks 3001-B, 3004-B, T-30, and 3013 at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program
unknown creator
July 1995
Primary view of The LCLS X-Ray FEL at SLAC
Cornacchia, Massimo
February 9, 1999
Primary view of Superlattice Photocathodes for Accelerator-Based Polarized Electron Source Applications
Clendenin, James E
March 22, 1999
Primary view of Results of design calculations. Specification of a prototype zone plate for focusing hard x-rays
Yun, W. B.; Chrzas, J. & Viccaro, P. J.
January 1991
Primary view of Solid Waste Assurance Program Implementation Plan
Irons, L.G.
June 19, 1995
Primary view of Preliminary design and estimate of capital and operating costs for a production scale application of laser decontamination technology
Pang, Ho-ming & Edelson, M. C.
August 6, 1994
Primary view of Functional design criteria for the self-installing liquid observation well
Parra, S.A.
June 16, 1995
Primary view of Multidimensional DDT modeling of energetic materials
Baer, M. R.; Hertel, E. S. & Bell, R. L.
July 1, 1995
Primary view of Geological and petrophysical characterization of the Ferron Sandstone for 3-D simulation of a fluvial-deltaic reservoir. Quarterly progress report, July 1--September 30, 1995
Allison, M. L.
October 30, 1995
Primary view of Geological and petrophysical characterization of the Ferron Sandstone for 3-D simulation of a fluvial-deltaic reservoir. Technical progress report, April 1--June 30, 1995
Allison, M. L.
July 28, 1995
Primary view of Laser Tabbed Die: A Repairable, High-Speed Die-Interconnection Technology. 1994 Ldrd Final Report 93-Sr-089
Malba, V. & Bernhardt, A. F.
September 1995
Primary view of US - Former Soviet Union environmental management activities
unknown creator
September 1995
Primary view of Leach test of cladding removal waste grout using Hanford groundwater
Serne, R. J.; Martin, W. J. & Legore, V. L.
September 1995
Primary view of Measurement and Modeling of Advanced Coal Conversion Processes, Volume I, Part 1. Final Report, September 1986--September 1993
Solomon, P. R.; Serio, M. A. & Hamblen, D. G.
September 1995
Primary view of Risk-based maintenance modeling. Prioritization of maintenance importances and quantification of maintenance effectiveness
Vesely, W. E. & Rezos, J. T.
September 1995
Primary view of Status of the flora and fauna on the Nevada Test Site, 1994: Results of continuing Basic Environmental Monitoring January through December 1994
Hunter, Richard B.
September 1995
Primary view of Removal of strontium and transuranics from Hanford tank waste via addition of metal cations and chemical oxidant: FY 1995 test results
Orth, R. J.; Zacher, A. H.; Schmidt, A. J.; Elmore, M. R.; Elliott, K. R.; Neuenschwander, G. G. et al.
September 1995
Primary view of UMTRA project water sampling and analysis plan, Naturita, Colorado. Revision 1
unknown creator
September 1995
Primary view of Effect of boundary conditions on the strength and deformability of replicas of natural fractures in welded tuff; Data report: Yucca Mountain Site Characterization Project
Wibowo, J.; Amadei, B.; Sture, S.; Robertson, A. B. & Price, R. H.
September 1993
Primary view of Diamond monochromators for APS undulator-A beamlines
Blasdell, R.C.; Assoufid, L.A. & Mills, D.M.
September 1995
Primary view of Regulatory and technical reports (abstract index journal). Volume 20, No. 2: Compilation for second quarter April--June 1995
unknown creator
September 1995
Back to Top of Screen