Search Results

Primary view of 0-2 kv Flash Tube Supplies
Miller, D. M.
March 15, 1962
Primary view of 1 Outreach, Education and Domestic Market Enhancement 2 Export Promotion and Assistance
Geothermal Energy Association
March 15, 2004
Primary view of 1 to 2 GeV/c beam line for hypernuclear and kaon research
Chrien, R. E.
February 15, 1985
Primary view of 2-D electric fields and drifts near the magnetic separatrix in divertor tokamaks
Mattor, N.; Porter, G. D.; Rognlien, T. D. & Ryutov, D. D.
November 15, 1998
Primary view of 2-D Modeling of Energy-z Beam Dynamics Using the LiTrack Matlab Program
Cauley, S .K. & Woods, M.
December 15, 2005
Primary view of A 3.3 MJ, Rb{sup +1} Driver Design Based on an Integrated Systems Analysis
Meier, W. R.; Barnard, J. J. & Bangerter, R. O.
September 15, 2000
Primary view of N >= 4 Supergravity Amplitudes from Gauge Theory at Two Loops
Boucher-Veronneau, C. & Dixon, L. J.
February 15, 2012
Primary view of 6 kv CAPACITOR CHARGING SUPPLY
Miller, D. M.
March 15, 1962
Primary view of 14 mrad Extraction Line Optics for Push-Pull
Nosochkov, Y.; Moffeit, K.; Seryi, A.; Morse, W. & Parker, B.
October 15, 2007
Primary view of 15-foot bubble chamber characteristics
Huson, F. R.
September 15, 1975
Primary view of 20-TeV colliding-beam facilities
Huson, F.R.
September 15, 1983
Primary view of 20% Wind by 2030: Overcoming the Challenges in West Virginia
Mann, Patrick & Risch, Christine
February 15, 2012
Primary view of A 20-year data set of surface longwave fluxes in the Arctic
Francis, Jennifer
June 15, 2004
Primary view of A 23-Group Neutron Thermalization Cross Section Library
Doctor, R. D. & Boling, M. A.
July 15, 1963
Primary view of ``24/36/48`` Cathode Strip Chamber layout for SSC GEM Detector muon subsystem
Belser, F. C.; Clements, J. W. & Horvath, J. A.
December 15, 1993
Primary view of 40-Mw(e) Prototype High-Temperature Gas-Cooled Reactor Postconstruction Research and Development Program. Summary Progress Report for the Period Ending, October 1964
unknown creator
December 15, 1964
Primary view of 45-Day safety screen results for Tank 241-C-201, Auger samples 95-AUG-025 and 95-AUG-026
Schreiber, R. D.
June 15, 1995
Primary view of 45-day safety screen results for tank 241-C-204, auger samples 95-Aug-022 and 95-Aug-023
Conner, J.M.
August 15, 1995
Primary view of 50-Channel Pulse-Height Analyzer Accelerator Type. Maintenance Manual
Heller, R. E.
December 15, 1953
Primary view of 50 kWp Photovoltaic Concentrator Application Experiment, Phase I. Final report, 1 June 1978-28 February 1979
Maget, H.J.R.
June 15, 1979
Primary view of 50 MeV polarimeter
Spinka, H.
April 15, 1980
Primary view of 100 Area D4 Project Building Completion Report - July 2007 to December 2008
Stankovich, M. T.
April 15, 2009
Primary view of 100 Areas, February 5--February 11
Jordan, W. E.
February 15, 1946
Primary view of 100 Areas technical activities report -- Physics, February 1949
Gast, P. F.
March 15, 1949
Back to Top of Screen