Search Results

open access

SSEI - IND-0116V2 REALIGN INDIAN HEAD

Description: Disregard Restriction of Header and Footer: 04/27/2005 - REALIGN 5” NAVY GUN PROJECTILE FROM INDIAN AND SIGNALS FROM AND GRENADES (PBX) FROM INDIAN HEAD TO CRANE ARMY DEPOT WITH 4 PERSONNEL BEING MOVED AND NO NEW CONSTRUCTION. REALIGN BOMB ENERGETIC PRODUCTION WORKLOAD FROM NAVY SURFACE WARFARE CENTER DIVISION, INDIAN HEAD, MD TO MCALESTER ARMY AMMUNITION PLANT, OK WITH NO PERSONNEL MOVES OR NEW CONSTRUTION.
Date: September 7, 2005
Creator: United States. Department of Defense.
Partner: UNT Libraries Government Documents Department
open access

Memorandum: Validation of Data for Base Realignment and Closure 2005, Aberdeen Proving Ground. Maryland (Project Code A-2003-IMT- 0440.048). Audit Report A-2005-00 1 1-AL.T - DTD 5 October 2004

Description: DISREGARD RESTRICTION HEADER AND FOOTER - Memorandum: Validation of Data for Base Realignment and Closure 2005, Aberdeen Proving Ground. Maryland (Project Code A-2003-IMT- 0440.048). Audit Report A-2005-00 1 1-AL.T - DTD 5 October 2004
Date: September 14, 2005
Creator: United States. Department of Defense.
Partner: UNT Libraries Government Documents Department
open access

Dept of the Army Auditing Docs, Report "Validation of Data for Base Realignment and Closure 2005, Aberdeen Proving Ground, Audit Report" (29 Jun 04)

Description: The Director, The Army Basing Study Group asked SAAG-IMT to validate data that the Study Group and six Joint Cross-Service Groups will use for Base Realignment and Closure (BRAC) 2005 analyses. This memorandum summarizes the results of their validation efforts at Aber-deen Proving Ground.
Date: September 5, 2005
Creator: United States. Department of Defense.
Partner: UNT Libraries Government Documents Department
Back to Top of Screen