Search Results

Primary view of 1,4-diphenylbutadiyne as a potential tritium getter
Miller, H. H.; Bissell, E. E.; Tsugawa, R. T. & Souers, P. C.
October 1, 1980
Primary view of 1-MWE Heat Exchangers for OTEC Final Design Report
Sprouse, A.M.
June 19, 1980
Primary view of 1/N
Coleman, S.
March 1, 1980
Primary view of [2 copies of Motion to Quash Supoena (filed 8/7/80) and notarized subpoena from state of Texas to Don Maison]
State of Texas
August 7, 1980
Primary view of [3 Letters from Donald J. Maison]
Maison, Donald J.
April 16, 1980
Primary view of 4 K to 20 K Rotational-Cooling Magnetic Refrigerator Capable of 1-Mw to >1-W Operation
Barclay, J. A.
February 1, 1980
Primary view of 4. pi. physics. [/sup 40/Ar + KCl, 0. 4 to 1. 8 GeV/A]
Sandoval, A.
March 1, 1980
Primary view of 10-MWe solar-thermal central-receiver pilot plant, solar-facilities design integration: plant-support subsystem procurement documentation (RADL Item 7-44D)
unknown creator
September 1, 1980
Primary view of 10-MWe solar-thermal central-receiver pilot plant, solar-facilities design integration: system integration laboratory test plan (RADL item 6-4)
unknown creator
October 1, 1980
Primary view of 17 wells: lithologic logs and temperature depth data
unknown creator
January 1, 1980
Primary view of 25 MV tandem accelerator at Oak Ridge
Jones, C. M.
January 1, 1980
Primary view of 30 MJ superconducting coil design and fabrication. Report No. GA-A16104. [NbTi]
Purcell, J. R.
September 1, 1980
Primary view of 30-MJ superconducting magnetic energy storage for BPA transmission line stabilizer
Schermer, R. I.
January 1, 1980
Primary view of 50 MeV polarimeter
Spinka, H.
April 15, 1980
Primary view of 60 GHz gyrotron development program. Quarterly report No. 4, April-June 1980
Shively, J.F.; Grant, T.J.; Stone, D.S.; Symons, R.S. & Wendell, G.E.
January 1, 1980
Primary view of 60 GHz gyrotron development program. Quarterly report No. 5, July-September 1980
Shively, J.F.; Grant, T.J.; Nordquist, A.L.; Stone, D.S. & Wendell, G.E.
January 1, 1980
Primary view of 64 kW concentrator Photovoltaics Application Test Center. Volume. Final report
Jardine, D.M. & Jones, D.W.
June 1, 1980
Primary view of 96
Hanson, Sten, 1936-2013
1980
Primary view of 124 E 170th St
Ortiz, William
1980
Primary view of 200 kW pulsed and CW gyrotrons at 28 GHz
Jory, H.; Evans, S.; Moran, J.; Shively, J.; Stone, D. & Thomas, G.
January 1, 1980
Primary view of 275/sup 0/C thick-film hybrid microcircuitry fabrication technology
Bonn, P.A. & Palmer, D.W.
July 1, 1980
Primary view of 700, 100, and 20 hp combustion test facility yearly activity report for the period April 1, 1979 to April 1, 1980
unknown creator
January 1, 1980
Primary view of 800-MWe HTGR-gas-turbine two-loop electric plant
unknown creator
June 1, 1980
Primary view of 850/sup 0/C VHTR plant technical description
unknown creator
June 1, 1980
Back to Top of Screen