Search Results

Primary view of 1. 5 GeV/c multiturn shaving extraction and its transport line for the Brookhaven AGS
Weng, W. T.; Blumberg, L. N.; Gill, E.; Soukas, A.; Witkover, R. L.; Egleman, E. et al.
January 1, 1979
Primary view of 1.5 megawatt dc chopper power supplies for plasma shape control on Doublet III
Rock, P. J. & Wesley, J. C.
November 1979
Primary view of 1-GWh diurnal load-leveling Superconducting Magnetic Energy Storage system reference design
Rogers, J. D.; Hassenzahl, W. V. & Schermer, R. I. (comps.)
September 1, 1979
Primary view of 1-GWh diurnal load-leveling superconducting magnetic energy storage system reference design. Appendix A: energy storage coil and superconductor
Schermer, R.I.
September 1, 1979
Primary view of 1-GWh diurnal load-leveling superconducting magnetic energy storage system reference design. Appendix B: cost study, high-purity aluminum production
Cochran, C. N.; Dawless, R. K. & Whitchurch, J. B.
September 1, 1979
Primary view of 1-GWh diurnal load-leveling superconducting magnetic energy storage system reference design. Appendix C: dewar and structural support
Bennett, J. G. & Ju, F. D.
September 1, 1979
Primary view of 1-GWh diurnal load-leveling superconducting magnetic energy storage system reference design. Appendix D: superconductive magnetic energy storage cavern construction methods and costs
unknown creator
September 1, 1979
Primary view of 1-GWh diurnal load-leveling superconducting magnetic energy storage system reference design. Appendix F. 1-GWh electrical system design
Boenig, H. J.
September 1, 1979
Primary view of S-1 project. Volume I. Architecture. 1979 annual report
unknown creator
January 1, 1979
Primary view of S-1 project. Volume II. Hardware. 1979 annual report
unknown creator
January 1, 1979
Primary view of 1 to 12 GeV/c beam transport for transverse or longitudinally polarized protons
Colton, E. P.
January 1, 1979
Primary view of 2 meg-ampere prototype levitated coil for multipole fusion
Green, M. A. & Glueck, R.
November 1, 1979
Primary view of [3 Cans Birdhouse, 1979]
Doherty, Richard, 1951-
1979
Primary view of 3 for 5
Zvonar, Richard
1979
Primary view of [A-6 Intruder at Naval Air Station Whidbey Island, 1]
unknown creator
October 1979
Primary view of [A-6 Intruder at Naval Air Station Whidbey Island, 2]
unknown creator
October 1979
Primary view of [A-6 Intruder at Naval Air Station Whidbey Island, 3]
unknown creator
October 1979
Primary view of [A-6 Intruder at Naval Air Station Whidbey Island, 4]
Gunderson, Nick
October 1979
Primary view of 10. 6. mu. m damage threshold measurements on sub-one-hundred-ps pyroelectric detectors
Stotlar, S. C.; McLellan, E. J.; Gibbs, A. J. & Webb, J.
January 1, 1979
Primary view of 10-MWe solar-thermal central-receiver pilot plant: collector subsystem foundation construction. Revision No. 1
unknown creator
December 18, 1979
Primary view of 10-MWe solar-thermal central-receiver pilot plant. Operating and maintenance manual
unknown creator
August 1, 1979
Primary view of 10-MWe solar-thermal central-receiver pilot plant. Phase II. Planning
unknown creator
August 1, 1979
Primary view of 12. 5 MHz heavy ion linac for ion beam fusion
Moretti, A.; Watson, J. M.; Moenich, J. S.; Foss, M. H.; Khoe, T. K.; Colton, E. P. et al.
1979
Primary view of N-13 Ammonia for the Noninvasive Evaluation of Myocardial Blood Flow by Positron Emission Computed Tomography
Schelbert, H. R. & Phelps, M. E.
January 1, 1979
Back to Top of Screen