Search Results

Primary view of Annual technical progress report: reactor safety, Government fiscal year 1978
unknown creator
December 31, 1978
Primary view of Baseline Gas Turbine Development Program. Twenty-Third Combined Quarterly Progress Report, May 1, 1978--January 31, 1979
Pampreen, R. C. & Wagner, C. E.
December 31, 1978
Primary view of [Experimental and Theoretical Plasma Physics Program]. Technical Progress in FY 1978
Griem, H.
December 31, 1978
Primary view of Numerical simulation of material transport in a regional ground-water flow system
Naymik, T.G. & Thorson, L.D.
December 31, 1978
Primary view of Particle beam fusion research at Sandia National Laboratories
unknown creator
December 31, 1978
Primary view of Study of Hydrocarbon-Shale Interaction
Schettler, P. D. & Wampler, D. L.
December 31, 1978
Primary view of Thin-Source Concentration Dependent Diffusion Volume 2
Eng, Genghmun
December 31, 1978
Primary view of Alternate materials of construction for geothermal applications. Progress report No. 17, October--December 1978
Steinberg, M. & Kukacka, L. E.
December 30, 1978
Primary view of Measurements of insolation variation over a solar collector field
unknown creator
December 30, 1978
Primary view of Aerial Radiometric and Magnetic Survey: Goldfield National Topographic Map, California and Nevada. Volume 1
High Life Helicopters, Inc.
December 29, 1978
Primary view of Energy analysis of geothermal energy supply systems. 1st quarterly report
Herendeen, R.A.
December 29, 1978
Primary view of Lawrence Livermore Laboratory heavy ion fusion program
Bangerter, R. O.; Lee, E. P.; Monsler, M. J. & Yu, S. S.
December 29, 1978
Primary view of Rio Blanco massive hydraulic fracture well RB-MHF-3. Final report
unknown creator
December 29, 1978
Primary view of Seismic risk analysis for Battelle Memorial Institute Nuclear Research Facility, West Jefferson, Ohio
unknown creator
December 29, 1978
Primary view of Seismic risk analysis for the Atomics International Nuclear Materials Development Facility, Santa Susana California
unknown creator
December 29, 1978
Primary view of SIG technology and converter-hardware schedule status as applicable to Galileo flight program. [Selenide Isotope Generator]
Hinderman, J.D.
December 29, 1978
Primary view of Solar production of industrial process steam at Ore-Ida frozen-fried-potato plant
Cherne, J. M.; Gelb, G. H.; Pinkerton, J. D. & Paige, S. F.
December 29, 1978
Primary view of Solar production of industrial process steam for the Lone Star Brewery. Conceptual design report
Deffenbaugh, D.M.
December 29, 1978
Primary view of Hydrogen attack of steel. Progress report, April 1, 1978--March 31, 1979
Shewmon, P. G.
December 27, 1978
Primary view of A scheme to improve the low energy luminosity in LEP
Wiedemann, H.
December 27, 1978
Primary view of 3X CPC Solar Collector. Technical Progress Report, May 7-November 7, 1978
Ballheim, Robert W.
December 22, 1978
Primary view of Billings Shipping Corporation: Freight Distribution Facility, Billings, Montana. Final technical report
unknown creator
December 22, 1978
Primary view of High-beta tokamak research. Quarterly status report, 1 October--31 December 1978. [Torus 1 and Torus 2 diagnostics]
Stone, P.
December 22, 1978
Primary view of Disk-cylinder method for using NMR to measure magnetic susceptibility
Burnham, A.K.
December 21, 1978
Back to Top of Screen