Advanced gas cooled nuclear reactor materials evaluation and development program. Selection of candidate alloys. Vol. 1. Advanced gas cooled reactor systems definition

Description: Candidate alloys for a Very High Temperature Reactor (VHTR) Nuclear Process Heal (NPH) and Direct Cycle Helium Turbine (DCHT) applications in terms of the effect of the primary coolant exposure and thermal exposure were evaluated. (FS)
Date: October 31, 1978
Creator: Marvin, M. D.
Partner: UNT Libraries Government Documents Department
open access

Evaluation of fuel resources and requirements for the magnetic fusion energy program

Description: Information is given for each of the following topics: (1) requirements for experimental fusion power reactors, (2) tritium requirements, (3) sources of T, (4) T availability from DOE production reactors, (5) T availability from heavy-water reactors, (6) T availability from light-water reactors, (7) T availability from fuel reprocessing plants, (8) natural Li requirements and availability, (9) /sup 6/Li requirements and availability, and (10) availability of /sup 3/He or /sup 4/He. (MOW)
Date: October 31, 1978
Creator: Rhinehammer, T.B. & Wittenberg, L.J.
Partner: UNT Libraries Government Documents Department
open access

Evaluation of selected chemical processes for production of low-cost silicon (Phase III). Silicon material task, low-cost solar array project. Eleventh-twelfth quarterly progress report, April 1--September 30, 1978

Description: Development of a process for producing high-purity silicon by zinc reduction of silicon tetrachloride in a fluidized bed of seed particles to yield a free-flowing granular product is reviewed. Progress in finalizing the design of a 50 MT/year experimental process facility is reported. (MHR)
Date: October 31, 1978
Creator: Blocher, J.M. Jr. & Browning, M.F.
Partner: UNT Libraries Government Documents Department
open access

Fabrication and characterization of uranium-6--niobium alloy plate with improved homogeneity

Description: Chemical inhomogeneities produced during arc melting of uranium--6 weight percent niobium alloy normally persist during fabrication of the ingot to a finished product. An investigation was directed toward producing a more homogeneous product (approx. 13.0-mm plate) by a combination of mechanical working and homogenization. Ingots were cast, forged to various reductions, homogenized under different conditions, and finally rolled to 13.0-mm-thick plate. It was concluded that increased forging reductions prior to homogenization resulted in a more homogeneous plate. Comparison of calculated and experimentally measured niobium concentration profiles indicated that the activation energy for the diffusion of niobium in uranium--niobium alloys may be lower than previously observed.
Date: October 31, 1978
Creator: Snyder, W.B.
Partner: UNT Libraries Government Documents Department
open access

Fatigue life of LOFT reactor vessel components

Description: This report provides calculated LOCE lifetimes of the LOFT reactor vessel components. For each component, lifetime is defined as the greatest number of LOCE transient cycles and/or other non-LOCE transient cycles such that cumulative usage factor does not exceed 1.0. The results are presented in tabular form. The results indicate that transients other than LOCE transients govern with or instead of LOCE transients for some components. The other transients are shown in the results.
Date: October 31, 1978
Creator: Kido, C. & Murdock, S.M.
Partner: UNT Libraries Government Documents Department
open access

LLL evaluated-nuclear-data library (ENDL): graphs of cross sections from the library. [Basic data for transport calculations]

Description: Graphs of neutron cross sections and related parameters for the LLL ENDL are presented. LLL and others use the evaluated nuclear data given here for neutron transport and related calculations. This document presents data contained in the library as of October 31, 1978. Evaluations of 79 nuclides/elements have been changed since the 1976 edition. Five tables discuss the information in the report, while the cross sections themselves are included on six microfiche.
Date: October 31, 1978
Creator: Howerton, R.J.; Cullen, D.E.; MacGregor, M.H.; Perkins, S.T. & Plechaty, E.F.
Partner: UNT Libraries Government Documents Department
open access

LOFT CIS analysis: 1''-SSS-3-E inside containment penetration S-11C

Description: The stress analysis performed on the 1''-SSS-3-E piping system inside containment penetration S-11C is described. Deadweight, thermal expansion, and seismic loads were considered. Results of this analysis show that the subject pipe system will meet ASME Boiler and Pressure Vessel Code, Section III, Class 2 Requirements provided that additional supports (S3 and S6) are installed as recommended.
Date: October 31, 1978
Creator: Nitzel, M.E.
Partner: UNT Libraries Government Documents Department
open access

LOFT primary coolant addition and Control Piping System stress analysis

Description: A stress analysis was performed on the Primary Coolant Addition and Control Piping System to determine if it met the conditions of the ASME Code, Section III, for Class 2 components. Results indicate that the Addition and Control System does not meet Section III criteria as the system is now installed. Only hanger (support) modifications are required to bring the stresses within the limits set forth in the Code. A design temperature of 459/sup 0/F was assumed for the analysis. The specified design temperature of 650/sup 0/F has been revised by ECRA's L-5713 and L-5714.
Date: October 31, 1978
Creator: Murdock, S.M.
Partner: UNT Libraries Government Documents Department
open access

Silicon on ceramic process. Silicon sheet growth and device development for the large-area silicon sheet and cell development tasks of the Low-Cost Solar Array Project. Annual report No. 3, September 20, 1977--September 29, 1978

Description: The objective of this research program is to investigate the technical and economic feasibility of producing solar-cell-quality sheet silicon by coating one surface of carbonized ceramic substrates with a thin layer of large-grain polycrystalline silicon from the melt. During the past year, the cell development task of the low-cost solar array project has also sponsored work leading to the solution of solar-cell-oriented problems unique to silicon-on-ceramic material. This work is described also. Fracture toughness and thermal shock measurements were made on various mullite compositions. The dip-coater experimentation involved using a variety of crucible positions and gas flow rates to improve coating speeds. The construction of the continuous coating facility was completed. Many modifications to the original design have been made to obtain better control of the temperature profile of the coater. An experimental dip-coater has been completed. The goal of this effort is to increase coating speeds to from 0.15 to 0.3 cm/sec without sacrificing material quality. The best slotted SOC cell fabricated to date has a 7.5 percent conversion efficiency (antireflective-coated, AM1, total area 4.1 cm/sup 2/). A standardized cell fabrication process was developed for slotted and unslotted SOC solar cells. Modeling activities have concentrated on three major areas: silicon growth, device design, and economic analysis. An economic projection was made using standard SAMICS procedures which indicated the target cost of $18/m/sup 2/ for silicon sheet could be met for certain SOC manufacturing conditions.
Date: October 31, 1978
Creator: Chapman, P W; Zook, J D; Heaps, J D; Maciolek, R B; Koepke, B; Grung, B L et al.
Partner: UNT Libraries Government Documents Department
open access

Western Gas Sands Project. Quarterly basin activities report

Description: This quarterly basin activities report is a summation of three months drilling and testing activities in the primary study areas of the WGSP; these include the Greater Green River Basin, the Northern Great Plains Province, the Piceance Basin, and the Uinta Basin. Additional low permeability sandstone areas are listed and located geographically. Activities in each primary study area are summarized under core program and dilling activity. (JRD)
Date: October 31, 1978
Partner: UNT Libraries Government Documents Department
open access

Western Gas Sands Project status report

Description: This edition of the WGSP status report summarizes September 1978 progress of the government-sponsored projects directed towards increasing gas production from the low-permeability gas sands of the western United States. Background information is provided in the September 1977 Status Report, NVO/0655-100. The Williston Basin Symposium was held in Billings, Montana, the 24th through the 27th of September 1978. The USGS continued work on characterization and assessment of the resource in the four primary study areas and completed the 1978 field work in the Sand Wash and Green River Basins. CER Corporation is evaluating a Twin Arrow drill site, located on the Douglas Creek Arch for the possibility of obtaining core, and preparations are being made for the Logging Program meeting to be held at the CER offices the latter part of October, 1978. The design phase for the pressure coring system has been completed and work is progressing on the fabrication and testing of the improved system. The National Laboratories and Energy Technology Centers continued work on mathematical model development, new tools and instrumentation systems, data analysis techniques and rock mechanics. Work continued on the field tests and demonstrations aspect of the WGSP. Bids sent to several service companies by Mitchell Energy Corporation, for a massive fracture treatment, are due back in October and the treatment is expected to be performed in mid-November. Mobil Research and Development fractured Zone 8 of their PCU 31-13 well, then shut it in due to anticipated winter weather and work was started on Zone 9. Sandia's mineback program involved evaluation of the Hole No. 6 Formation Interface Fracture Experiment.
Date: October 31, 1978
Creator: Atkinson, C.H.
Partner: UNT Libraries Government Documents Department
open access

Electronics Engineering Department quarterly report No. 3, 1978

Description: Separate abstracts are included for development programs for electronic equipment involved with plasma research, data processing, uranium environmental surveys, and geothermal surveys.
Date: October 30, 1978
Partner: UNT Libraries Government Documents Department
open access

Geothermal exploration and assessment technology program plan. Final report

Description: The following program plan elements are described: barriers to commercialization, cost/benefit analysis for exploration assessment technology (hydrothermal systems), goals, objectives, technical plan, management plan, budget, and procurement plan. (MHR)
Date: October 30, 1978
Partner: UNT Libraries Government Documents Department
open access

LOFT CIS analysis 4''-WH-237-E inside containment penetration S-17B

Description: The stress analysis performed on the 4''-WH-237-E piping system inside containment penetration S-17B is presented. Deadweight, thermal expansion, and seismic loads were considered. Results of this analysis show that the subject piping system will meet ASME Code, Section III, Class 2 requirements.
Date: October 30, 1978
Creator: Nitzel, M.E.
Partner: UNT Libraries Government Documents Department
open access

Safety margins associated with containment structures under dynamic loading. [BWR Mark I]

Description: A technical basis for assessing the true safety margins of containment structures involved with MARK I boiling water reactor reevaluation activities is presented. It is based on the results of a plane-strain, large displacement, elasto-plastic, finite-element analysis of a thin cylindrical shell subjected to external and internal pressure pulses. An analytical procedure is presented for estimating the ultimate load capacity of the thin shell structure, and subsequently, for quantifying the design margins of safety for the type of loads under consideration. For defining failure of structures, a finite strain failure criterion is derived that accounts for multiaxiality effects.
Date: October 30, 1978
Creator: Lu, S.C.
Partner: UNT Libraries Government Documents Department
open access

Program plan for molten carbonate fuel-cell systems development

Description: The purpose of this document is to describe in both programmatic and technical terms the methodology that the US Department of Energy will use to commercialize a molten carbonate fuel cell power plant. Responsibility for the planning and management of the program resides in the molten carbonate fuel cell program office at the Argonne National Laboratory which reports to the Assistant Director for Fuel Cells in the Division of Fossil Fuel utilization of DOE/FE. The actual development of technology is carried out by selected contractors. The technology development phase of the program will culminate with the construction and operation of two demonstration power plants. The first power plant will be an industrial cogeneration plant which will be completed in 1987. The other power plant will be a baseload electric power plant to be completed in 1989.
Date: October 27, 1978
Partner: UNT Libraries Government Documents Department
open access

Analysis of beryllium parts for cosmos 954

Description: Operation Morning Light was conducted to search for the reactor core of Cosmos 954, the nuclear-powered Soviet satellite that crashed in the northwest territories of Canada in late January 1978. many of the satellite parts found were beryllium. This study discusses the geometry, condition, microstructure, and possible fabrication history of these beryllium parts.
Date: October 25, 1978
Creator: Hanafee, J.E.
Partner: UNT Libraries Government Documents Department
open access

The Nuclear Non-Proliferation Act of 1978, Public Law 95-242: An Explanation

Description: This report exists to explain what the The Nuclear Non-Proliferation Act of 1978, Public Law 95-242 does by outlining the ideal use of nuclear energy implicit in the legislation and then explains the major parts of the act itself.
Date: October 25, 1978
Creator: Donnelly, Warren H.
Partner: UNT Libraries Government Documents Department
open access

Special Conditions for HGP-A Wellhead Generator Proof-of-Feasibility Project, Specification S-00-001

Description: This specification applies to the general requirements of all purchased materials and equipment and provides general instructions for Suppliers. Purchaser as referred to here under is the Research Corp. of University of Hawaii. Rogers Engineering Co., Inc. is the authorized representative of the Research Corp. of University of Hawaii with respect to purchases made under this specification.
Date: October 25, 1978
Partner: UNT Libraries Government Documents Department
open access

Thin film battery/fuel cell power generating system. Second quarterly report, July 1, 1978-September 30, 1978

Description: Progress is reported on the development of the high-temperature solid-oxide electrolyte fuel cell. Oxygen loss behavior in the lanthanum chromite interconnection material was investigated by the microweighing technique. RF sputtered interconnection bands have been produced that display suitable density to permit the technique to be used in the construction of cell stacks. Electrochemical vapor deposition equipment has been modified to enable preparation of 20 cell fuel cell stack fabrication to proceed. The fuel electrode process and equipment have been improved to permit fabrication of long (0.3 m) tube segments, showing good mechanical and electrical properties. Long tube sections have been used to fabricate air electrodes, having desired porosity without loss of conductivity. Porous support tube work (involving equipment and fabrication techniques) is being extended to the fabrication of 0.3 m long tubes, needed for the fabrication of the 20 cell stacks. Work continues on the construction of the 5 station fuel cell stack life test facility. Theoretical interpretations of fuel cell stack polarization losses have been compared with actual measured losses in the 5 cell fuel cell stack previously tested in the program. Analyses of the intercell leakage current in the five cell fuel cell stack that was life tested for 700 hours were conducted. (WHK)
Date: October 25, 1978
Creator: Feduska, W.
Partner: UNT Libraries Government Documents Department
Back to Top of Screen