Search Results

Primary view of Eleventh-Twelfth Quarterly Progress Report Covering the Period April 1 to September 30, 1978 on Evaluation of Selected Chemical Processes for Production of Low-Cost Silicon (Phase III)
Blocher, J. M., Jr. & Browning, M. F.
October 31, 1978
Primary view of Storm Data and Unusual Weather Phenomena, Volume 20, Number 8, August 1978
National Climatic Center
1978-10~
Primary view of Guideline on Major Job Accounting Systems: The System Management Facilities (SMF) for IBM Systems Under OS/MVT
Durbin, Gary; Kinney, Todd M.; Lamasney, Peter; Newman, Edward & Syrett, Edward
October 1978
Primary view of NURE Aerial Gamma-Ray and Magnetic Reconnaissance Survey, Chugach/Yakutat Area, Alaska: Volume 2. Bering Glacier Quadrangle
LKB Resources, Inc.
October 1978
Primary view of NURE Aerial Gamma-Ray and Magnetic Reconnaissance Survey, Chugach/Yakutat Area, Alaska: Volume 2. Cordova Quadrangle
LKB Resources, Inc.
October 1978
Primary view of NURE Aerial Gamma-Ray and Magnetic Reconnaissance Survey, Chugach/Yakutat Area, Alaska: Volume 2. Icy Bay Quadrangle
LKB Resources, Inc.
October 1978
Primary view of NURE Aerial Gamma-Ray and Magnetic Reconnaissance Survey, Chugach/Yakutat Area, Alaska: Volume 2. Mt. Saint Elias Quadrangle
LKB Resources, Inc.
October 1978
Primary view of NURE Aerial Gamma-Ray and Magnetic Reconnaissance Survey, Chugach/Yakutat Area, Alaska: Volume 2. Valdez Quadrangle
LKB Resources, Inc.
October 1978
Primary view of NURE Aerial Gamma-Ray and Magnetic Reconnaissance Survey, Chugach/Yakutat Area, Alaska: Volume 2. Yukatat Quadrangle
LKB Resources, Inc.
October 1978
Primary view of Energy reduction analysis report for Tropicana solar process steam system
unknown creator
October 1, 1978
Primary view of Analysis of Potential Implementation Levels for Waste Heat Utilization in the Nuclear Power Industry
Olszewski, M. & Bigelow, H. R.
October 30, 1978
Primary view of Laboratory Manual for Salt Mixing Test in Rod Bundles
Kahn, H.; Chiu, C. & Todreas, N.
October 1, 1978
Primary view of Polyketones and Polysulfones for Conservation in the Ethylene Polymer Industry. Progress Report No. 3, October--December 1978.
Steinberg, M.; Cordes, W.; Johnson, R. & Goodman, D.
October 1, 1978
Primary view of LOFT CIS Analysis 8''-WW-172-AB inside Penetration S-7A.
Condie, C. G.
October 30, 1978
Primary view of Photovoltaic Solar Panel Resistance to Simulated Hail
Moore, Donald & Wilson, Abraham
October 15, 1978
Primary view of Study of Hydrocarbon-Shale Interaction: Progress Report #11 (Part 2)
unknown creator
October 21, 1978
Primary view of Silicon Sheet Growth Development of the Large Area Silicon Sheet Task of the Low Cost Silicon Solar Array Project Fifth Quarterly Progress Report, October 1-December 31, 1978
Merz, F.
October 1, 1978
Primary view of Study Program to Develop and Evaluate Die and container Materials for the Growth of Silicon Ribbons Quarterly Report No. 4
unknown creator
October 1, 1978
Primary view of Recalculation of Loads on Loft Penetrations 1A, 2A, 3E, 3F, 5A, 5B, 5C, 5D, 5E, 5F, 7A, 9A, 11C, 17A, 17B, 20A, 20B, 20C, 21A
Fadden, D. F.
October 31, 1978
Primary view of PARAMETRIC THERMOELASTIC ANALYSES OF HIGH-LEVEL WASTE AND SPENT FUEL REPOSITORIES IN GRANITE AND OTHER NON-SALT ROCK TYPES
Osnes, John D.; Wagner, Ralph A. & Waldman, Henry
October 1, 1978
Primary view of Analytical Approximations to the Thermoelastic Behavior of Repository Configurations
Callahan, Gary D. & Gnirk, Paul F.
October 13, 1978
Primary view of LOFT CIS Analysis S-5B Penetration 3" IA-296-AB.
Barry, W. J., Jr.
October 31, 1978
Primary view of Closing a Congressional Office: A Brief Overview
Yacker, Marc D.
October 10, 1978
Primary view of Engineering-economic analysis of mobile home thermal performance
Hutchins, P.F. Jr. & Hirst, E.
October 1, 1978
Back to Top of Screen