Search Results

Primary view of [2 guys posing at an office desk]
WBAP-TV (Television station : Fort Worth, Tex.)
1964
Primary view of [2 men posing at a WBAP office desk]
WBAP-TV (Television station : Fort Worth, Tex.)
1964
Primary view of [2 still images from "I Love Lucy" playing on a television set]
WBAP-TV (Television station : Fort Worth, Tex.)
1964
Primary view of [3 men pictured at WBAP's new tower site]
WBAP-TV (Television station : Fort Worth, Tex.)
June 1, 1964
Primary view of [3 men pictured with Spectracide products]
WBAP-TV (Television station : Fort Worth, Tex.)
June 8, 1964
Primary view of 10-30 Bev/c ELASTIC SCATTERING OF $pi$$sup +-$+ p, p + p, /anti p/ + p AND K$sup +-$ + p OVER THE /t/ RANGE 0.0005 TO 1 (Bev/c)$sup 2$
Foley, K. J.; Gilmore, R. S.; Jones, R. S.; Lindenbaum, S. J.; Love, W. A.; Ozaki, S. et al.
July 28, 1964
Primary view of A-11 seven cluster model: FFL-10 solid core tests
Cherish, P. & Leff, G.J.
December 18, 1964
Primary view of A-11 seven cluster model: Phase V, flow induced vibration tests
Cherish, P. & Leff, G.J.
September 29, 1964
Primary view of The 25-Inch Liquid Hydrogen Bubble Chamber
Barrera, F.; Byrns, R. A.; Eckman, G. J.; Hernandez, H. P.; Norgren, D. U.; Shand, A. J. et al.
May 25, 1964
Primary view of 40-Mw(e) Prototype High-Temperature Gas-Cooled Reactor Postconstruction Research and Development Program. Summary Progress Report for the Period Ending, October 1964
unknown creator
December 15, 1964
Primary view of 40-Mw(E) Prototype High-Temperature Gas-Cooled Reactor. Research and Development Program. Quarterly Progress Report for the Period Ending March 31, 1963
unknown creator
October 31, 1964
Primary view of 100-KEW coolant backup adequacy
Heacock, H. W.
April 29, 1964
Primary view of 105-F intermediate range test hole parameters
Erickson, G. L.
November 16, 1964
Primary view of 241-SX tank farm waste storage
Hanson, G. L.
September 3, 1964
Primary view of 500-Thgc--a 500 Node Transient Heat Transfer Code
Blaine, R. A. & Berland, R. F.
March 27, 1964
Primary view of 1000 MegaWatt Boiling Water Reactor Plant Feasibility Study: Volume 1
General Electric Company
February 14, 1964
Primary view of 1000 MegaWatt Boiling Water Reactor Plant Feasibility Study: Volume 2
General Electric Company
February 14, 1964
Primary view of 1000 MegaWatt Boiling Water Reactor Plant Feasibility Study: Volume 3
General Electric Company
February 14, 1964
Primary view of 1000-Mwe SGR. 90% ThO₂, 10% UO₂ Alternate Fuel Core Thermal and Hydraulic Analysis
Imig, J. K.
February 19, 1964
Primary view of 1000-Mwe Sgr and Prototype Evaluation Study. Supplement
unknown creator
July 1, 1964
Primary view of [1964-1965 Men's varsity basketball team]
unknown creator
[1964..1965]
Primary view of [1964-1965 Men's Varsity Basketball Team, 2]
unknown creator
[1964,1965]
Primary view of [1964-1965 Men's Varsity Basketball Team, 3]
unknown creator
[1964,1965]
Primary view of [1964-1965 Men's varsity basketball team, 4]
unknown creator
[1964..1965]
Back to Top of Screen