Search Results

Primary view of 1000 MegaWatt Boiling Water Reactor Plant Feasibility Study: Volume 1
General Electric Company
February 14, 1964
Primary view of 1000 MegaWatt Boiling Water Reactor Plant Feasibility Study: Volume 2
General Electric Company
February 14, 1964
Primary view of 1000 MegaWatt Boiling Water Reactor Plant Feasibility Study: Volume 3
General Electric Company
February 14, 1964
Primary view of 1000-Mwe SGR. 90% ThO₂, 10% UO₂ Alternate Fuel Core Thermal and Hydraulic Analysis
Imig, J. K.
February 19, 1964
Primary view of Advanced Test Reactor Servo Regulator Rod Test Program
Pickett, R. T., III
February 1964
Primary view of ANALOG SOLUTION OF A MODEL OF THE SOURCES OF ELUTRIATABLE FINES IN THE FLUIDIZED BED CLACINATION PROCESS
Grimmett, E.S.
February 28, 1964
Primary view of ANALYSIS OF SNAP REACTOR COOLANT CROSS-FLOW IN THE SNAP-2 REACTOR EXCLUDING THE PERIPHERAL $sub 4$UNFED$sub 4$ CHANNEL
Montgomery, L.D.
February 20, 1964
Primary view of Analysis of the Third H-Reactor Core Load
Ringle, R. P.
February 10, 1964
Primary view of ANALYTICAL CHEMISTRY DIVISION ANNUAL PROGRESS REPORT FOR PERIOD ENDING NOVEMBER 15, 1963
unknown creator
February 18, 1964
Primary view of Army Gas-Cooled Reactor Systems Program Quarterly Progress Report: October 1 - December 31, 1963
Aerojet-General Corporation
February 15, 1964
Primary view of Asymptotic Solutions to Compound Decision Problems
Van Ryzin, J. R.
February 1964
Primary view of Axial flux data for fuel measurement
Popovich, R. P.
February 11, 1964
Primary view of AXIAL TEMPERATURE AND PRESSURE DISTRIBUTION IN EGCR. DEVELOPMENT OF THE PTD-1 PROGRAM
Robinson, J.C. & Lence, J.T.
February 18, 1964
Primary view of Base Surge and Cloud Formation
Rohrer, R.
February 1, 1964
Primary view of The Breeding Ratio of a Plutomium Loading in Ebr-I
Smith, R. R.; Haroldsen, R. O.; Horne, R. E. & Matlock, R. G.
February 1964
Primary view of Calculations of k for Some Small U233-, U235-, and Pu239- Fueled Fast Reactors
Davey, W. G.
February 1, 1964
Primary view of Chemical Processing Department Monthly Report: January 1964
Hanford Atomic Products Operation. Chemical Processing Department.
February 20, 1964
Primary view of COMPATIBILITY STUDIES OF SEVERAL MOLTEN URANIUM AND THORIUM ALLOYS IN NIOBIUM, TANTALUM, AND YTTRIUM
Cash, R.J.; Fisher, R.M. & Core, M.R.
February 1, 1964
Primary view of Construction of a Sea-Level, Transisthmian Canal Using Nuclear Explosives
Vortman, Luke J.
February 1964
Primary view of Control Drum Bearings, Experiment No. 40/W004, Irradiated at Plum Brook Reactor Facility, PBRF Cycle 6 (PB No. 2W). Preliminary Data Report
Stephens, A. G.
February 19, 1964
Primary view of Cylindrical Lattice Collision Probability Codes, B692/RP
Pennington, E. M.
February 1, 1964
Primary view of DATA SIMULATION WITH AN ON-LINE COMPUTER AS A DIAGNOSTIC AND ANALYTICAL TOOL
Mollenauer, J.F.
February 19, 1964
Primary view of Decontamination of Savannah River Waste Supernate by Ion Exchange
Katz, H. & Rothbart, M.
February 1, 1964
Primary view of Design and Fabrication of Fuel Rods Containing Sintered UO2 Extrusions - Assembly 11L
Megerth, F. H.
February 1964
Back to Top of Screen