Search Results

Primary view of 100-N technical manual. Volume 2A: Systems descriptions
unknown creator
December 31, 1963
Primary view of Evaluation of anticriticality destruct system concepts
Chamberlain, C.C. (ed.)
December 31, 1963
Primary view of Mound Laboratory Progress Report for December 1963
Eichelberger, J.F.; Grove, G.R. & Jones, L.V.
December 31, 1963
Primary view of Rear face hardware replacement 105-B, D, DR, F, and H
Barker, C. R. & Young, J. R.
December 31, 1963
Primary view of SNAP PRELAUNCH TEST FACILITY SAFEGUARDS REPORT
Ureda, B.F.
December 31, 1963
Primary view of Esada Fuel Fabrication Development Program. Terminal Report. Volume 1. Program Summary--Fabrication and Cost Analysis
Magnus, D. K.
December 30, 1963
Primary view of Esada Fuel Fabrication Development Program. Terminal Report. Volume 3. Uranium Carbide Slug Fabrication--Development and Production
Turner, D.H.
December 30, 1963
Primary view of ESADA FUEL FABRICATION DEVELOPMENT PROGRAM. TERMINAL REPORT. VOLUME IV. UC FUEL ROD, ELEMENT, AND ASSEMBLY--DEVELOPMENT AND PRODUCTION
Draganchuk, W. & Cobb, S.M.
December 30, 1963
Primary view of WANEF operating limits, modification No. 1. Battery voltage supplies for WANEF ion chambers
Kovacik, W. P.
December 30, 1963
Primary view of Westinghouse Astronuclear WANEF pre-operational systems tests
Freidhof, W.E.
December 30, 1963
Primary view of Fuel Element Grapple and Fuel Element Hold-Down Latch Development--Large Sgr Fuel Handling
Ybarra, R. M.
December 28, 1963
Primary view of Campaign rework of Z-Plant material at Purex
Judson, B. F. & Kendall, J. B.
December 26, 1963
Primary view of Candidate Transducer Data Sheets for Instrumentation Data Book
Teyssier, D. R.
December 26, 1963
Primary view of PITA IP-27C: Part 2, Increased coolant flow, H reactor operational physics requirements
Bowers, C. E. & Conner, E. L., Jr.
December 26, 1963
Primary view of Low-Cost Organic Moderator-Coolants for Nuclear Reactors
Gardner, L. E.; Hutchinson, W. M. & Hillyer, J. C.
December 23, 1963
Primary view of Status of canning cycle optimization study
Hutton, T. W.
December 23, 1963
Primary view of Chemical Processing Department Monthly Report: November 1963
Hanford Atomic Products Operation. Chemical Processing Department.
December 20, 1963
Primary view of Effectiveness of Ilmenite-Loaded Concrete in Attenuating Neutron Radiation Produced by a 5-Bev Photon Beam
Kao, S. & Voss, G.
December 20, 1963
Primary view of PITA IP-27-I, Part 1 increased coolant flow, H reactor
Clinton, M. A. & Spicka, R. E.
December 20, 1963
Primary view of Westinghouse Astronuclear WANEF training program
Ney, E.J.
December 20, 1963
Primary view of PATHFINDER ATOMIC POWER PLANT. BURNUP LIMITS FOR PATHFINDER TWO WEIGHT PER CENT NATURAL BORON-STAINLESS STEEL CONTROL RODS
Patterson, D.A. & Nehrig, D.A.
December 19, 1963
Primary view of SNAP-8 Corrosion Program. Quarterly Progress Report for Period Ending August 31, 1963
Savage, H. W.; Compere, E. L.; Huntley, W. R. & Taboada, A.
December 19, 1963
Primary view of Design manual and hazards analysis for experiment No. 40/W004, control drum bearings at Plum Brook Reactor Facility (RF1,63-05)
Cadoff, H. & Newby, D.
December 18, 1963
Primary view of NEUTRON PHYSICS DIVISION ANNUAL PROGRESS REPORT FOR PERIOD ENDING AUGUST 1, 1963
unknown creator
December 18, 1963
Back to Top of Screen