Search Results

Primary view of Uniformly Reactive Uranium Dioxide from a Single Oxidation-Reduction Cycle
Orrick, N. C.; Jones, C. G.; Hale, C. F.; Barber, E. J. & Rapp, Karl E.
August 28, 1963
Primary view of Internal graphite moderator forces study, C and K Reactors
Cooley, D. E.
October 28, 1963
Primary view of Loading, operating conditions, and water shutoff times for a charge of twelve 17-inch N inner fuel tubes or twelve 18-inch U-2 w/o Zr elements, PT-IP-536-A and PT-IP-536-A, Supplement B
Kratzer, W. K. & Wise, M. J.
January 28, 1963
Primary view of Feasibility of the use of induction heating equipment for Pilot Plant development work
Powers, H. G.
August 28, 1963
Primary view of Economic analysis of 10-inch and 12-inch fuel element production for three separate conditions
Grubb, F. W.
January 28, 1963
Primary view of Control rod studies
Cole, A.
February 28, 1963
Primary view of Nuclear subsystem control and its integration into engine control
unknown creator
May 28, 1963
Primary view of Laboratory development of a process for recovering uranium from Rover fuel by combustion, liquid-phase chlorination with hexachloropropene, and aqueous extraction
Gens, T.A. & Borne, T.B.
June 28, 1963
Primary view of Effect of Massive Neutron Exposure on the Distortion of Reactor Graphite
Helm, J. W. & Davidson, J. M.
May 28, 1963
Primary view of Secondary Missiles Generated by Nuclear-Produced Blast Waves
Bowen, I. Gerald; Franklin, Mary E.; Fletcher, E. Royce & Albright, Ray W.
October 28, 1963
Primary view of Penetration Effects in Magnetic-Dipole L-shell Internal Conversion
Church, E. L.
January 28, 1963
Primary view of Some Further Remarks on Beam Current Measurements in the AGS
Raka, E. C.
January 28, 1963
Primary view of A Simple Theory of the Process P+P → D+W+
Bernstein, Jeremy
January 28, 1963
Primary view of Safety Analysis Report : Snaptran 2/10A-1 Safety Tests
Waage, J. M.
January 28, 1963
Primary view of Tensile and Impact Properties of Selected Materials From 20 to 300 ºK
Warren, K. A. & Reed, R. P.
June 28, 1963
Primary view of Calibration of Control Drums in a Sub-Critical Assembly
Rothman, A. B.
February 28, 1963
Primary view of Automatic Neutronics Calibration
Kendziorek, W.M.
January 28, 1963
Primary view of Mound Laboratory Progress Report for June 1963
Eichelberger, J. F.; Grove, G. R. & Jones, L. V.
June 28, 1963
Primary view of The Diffusion of Lithium in Aluminum
Costas, L. P.
February 28, 1963
Primary view of Fuel Element Grapple and Fuel Element Hold-Down Latch Development--Large Sgr Fuel Handling
Ybarra, R. M.
December 28, 1963
Primary view of Reduction of Plutonium (VI) to Plutonium(III) and (IV) by Sodium Nitrite
Colvin, C. A.
October 28, 1963
Primary view of A Generalized Shielding Study for Nuclear Electric Space Power Plants
Berry, E. R.
August 28, 1963
Primary view of A PRELIMINARY EXAMINATION OF THE FORMATION AND UTILIZATION OF TEXTURE AND ANISOTROPY IN ZIRCALOY-2
Picklesimer, M.L.
February 28, 1963
Primary view of DESCRIPTION OF PRINTED OUTPUT FROM INTRANUCLEAR CASCADE CALCULATION
Bertini, H.W.
May 28, 1963
Back to Top of Screen