Search Results

Primary view of 0-2 kv Flash Tube Supplies
Miller, D. M.
March 15, 1962
Primary view of 0-2 kv Flash Tube Supplies
Miller, D. M.
March 15, 1962
Primary view of 1.5% boron, stainless steel
Schreiber, J.J.
September 19, 1962
Primary view of 6 kv CAPACITOR CHARGING SUPPLY
Miller, D. M.
March 15, 1962
Primary view of 6 kv Capacitor Charging Supply
Miller, D. M.
March 15, 1962
Primary view of 12-INCH SODIUM FLOW CONTROLLER. Technical Manual 20357
unknown creator
October 31, 1962
Primary view of 20-ton and 1/2-ton High Explosive Cratering Experiments in Basalt Rock: Final Report, August 1962
Vortman, L. J.; MacDougall, H. R. & Rauber, D. F.
August 1962
Primary view of 30 Megawatt Heat Exchanger and Steam Generator for Sodium Cooled Reactor System
Alco Products (Firm)
January 31, 1962
Primary view of 30 Megawatt Heat Exchanger and Steam Generator for Sodium Cooled Reactor System: Volume 2, Chemical and Stress Analysis
Alco Products (Firm)
February 28, 1962
Primary view of 30 Megawatt Heat Exchanger and Steam Generator for Sodium Cooled Reactor System: Volume 4, Operation and Maintenance Procedures
Alco Products (Firm)
May 15, 1962
Primary view of 190-DR steam turbine backup adequacy report
Radtke, W. H. & Keplinger, E. R.
November 8, 1962
Primary view of 333 Building preliminary survey potential equipment improvements
Drumheller, K.
August 22, 1962
Primary view of A 1000 HOUR TEST OF A CORROSION PRODUCT SEPARATOR UNIT IN A HAYNES ALLOY NO. 25 LOOP CONTAINING MERCURY--TEST G-16
Nejedlik, James F.
March 1, 1962
Primary view of 14CO2 INCORPORATION INTO THE NUCLEIC ACIDS OF SYNCHRONOUSLYGROWING CHLORELLA CELLS
Stange, Luise; Kirk, Martha; Bennett, Edward L. & Calvin, M.
March 8, 1962
Primary view of THE 1962 He$sup 3$ SCALE OF TEMPERATURES. II. DERIVATION
Sydoriak, S. G.; Roberts, T. R. & Sherman, R. H.
January 1962
Primary view of 2D PERT. A TWO-DIMENSIONAL PERTURBATION CODE
Chaumont, J. M. & Koerner, J. A.
May 1, 1962
Primary view of The 4K ANGIE Code
Stone, Stuart P.
March 5, 1962
Primary view of 630A Maritime Nuclear Steam Generator Scoping Study
General Electric Company. Flight Propulsion Division.
April 6, 1962
Primary view of THE ABSENCE OF AVOIDANCE RECOGNITION BY THE MOUSE SUBJECTED TO CHRONIC INVARIANT $gamma$-RAY EXPOSURES
Hensley, J.C. & Spalding, J.F.
January 1, 1962
Primary view of The Absolute Abundance of the Chromium Isotopes in Some Secondary Minerals
Svec, Harry J. (Harry John), 1918-; Flesch, G. D. & Capellen, J.
1962
Primary view of THE ABSOLUTE ABUNDANCE OF THE CHROMIUM ISOTOPES IN SOME SECONDARY MINERALS
Svec, H. J.; Flesch, G. D. & Capellen, J.
March 14, 1962
Primary view of Absorber Burn-Up Experiment. Final Report
Russell, J. L. Jr.; Carrothers, M. R. & Mosgovoy, W. V.
April 1962
Primary view of Absorption and Turnover Rates of Iron Measured by the Whole Body Counter
Price, D. C.; Cohn, S. H. & Cronkite, B. P.
September 5, 1962
Primary view of ABWR Design and Development Quarterly Progress Report, January 1 Through March 31, 1962
Combustion Engineering, inc. Nuclear Division.
April 15, 1962
Back to Top of Screen