Search Results

Primary view of Army PWR Support and Development Program Six Months Summary Report : October 1, 1961 - March 31, 1962
Dixon, M. H.
May 25, 1962
Primary view of Calculation of effective boron cross sections in the reflector for one dimensional calculations
Stevens, C.
May 25, 1962
Primary view of Color Production From Energetic Ions Impinging On Metals
Ehlers, Kenneth W.
June 25, 1962
Primary view of Conceptual Design for 75 MWe Mixed Spectrum Superheating Reactor Power Plant
U.S. Atomic Energy Commission
February 25, 1962
Primary view of Conceptual Design for a 75 MWE Mixed Spectrum Superheating Reactor Power Plant
Brynsvold, G. V.; Hikido, K.; Reynolds, A. B. & Riley, D. R.
February 25, 1962
Primary view of The Deflecting Mode in the Circular Iris-Loaded Waveguide of a RF Particle Separator
Hahn, H.
October 25, 1962
Primary view of THE DEFLECTING MODE IN THE CIRCULAR IRIS-LOADED WAVEGUIDE OF A RF PARTICLE SEPARATOR. Internal Report
Hahn, H.
October 25, 1962
Primary view of Development of a Fluidized Bed Calcination Process for Aluminum Nitrate Wastes in a Two-Foot-Square Plant Calciner. Part 2. Factors Affecting the Intra-Particle Porosity of Alumina
Wheeler, B. R.; Grimmett, E. S. & Buckham, J. A.
July 25, 1962
Primary view of Experimental Beryllium Oxide Reactor Program. Quarterly Progress Report for the Period, January 1 Through March 31, 1962
unknown creator
April 25, 1962
Primary view of Final report: Irradiation performance of a coextruded, Zircaloy-2-clad three-rod cluster fuel elements, PT-IP-186-A
Call, R. L.
July 25, 1962
Primary view of Fuel Cycle Program - A Boiling Water Reactor Research and Development Program: Ninth Quarterly Progress Report July 1962 - September 1962
Howard, C. L.
October 25, 1962
Primary view of Geology of core hole WP-4 Tatum dome, Lamar County, Mississippi. Technical letter: Dribble-19
Eargle, D.H.
April 25, 1962
Primary view of GRAPHITE-STAINLESS STEEL COMPATIBILITY STUDIES
Fleischer, B.; DeVan, J. H. & Coobs, J. H.
September 25, 1962
Primary view of Hallam Nuclear Power Facility, Preoperational Test Interim Report Dry Excess Loading
Kempt, H. C. & Corcoran, W. P.
February 25, 1962
Primary view of Horizontal control rod corrosion, KW Reactor
Renberger, D. L.
May 25, 1962
Primary view of Hydrologic and Geologic Studies for Project Gnome: Progress Report
Geological Survey (U.S.)
September 25, 1962
Primary view of Low exposure irradiation of an enriched seven-rod cluster in KER Loop 1, PR-IP-246-A: Final report
Call, R. L.
July 25, 1962
Primary view of Measured vs calculated river {Delta}T
Corley, J. P.
October 25, 1962
Primary view of Molecular Spectra and Structure of the Compound, AlH3-2N(CH3)3
Heitsch, C. W. & Kniseley, R. N.
May 25, 1962
Primary view of Murgatroyd-an Ibm 7090 Program for the Analysis of the Kinetics of the Msre
Nestor, C. W. Jr.
May 25, 1962
Primary view of A Needle in a Haystack
Bernstein, J. & Feinberg, Gerald, 1933-1992
May 25, 1962
Primary view of NPR Physics Startup Testing Program
Bowers, C. E.
April 25, 1962
Primary view of On the Use of a Modified Radial Distribution Analysis for Indexing Powder Patterns
Berndt, A. F.
June 25, 1962
Primary view of Power Distributions for Type 3 Replacement Cores for SM-1, SM-1A and PM-2A
Oggerino, J. P.
July 25, 1962
Back to Top of Screen