Search Results

Primary view of Health and Safety Laboratory Fallout Program Quarterly Summary Report: March 1, 1961 - June 1, 1961
Hardy, Edward P., Jr.; Rivera, Joseph & Frankel, Robert
July 1, 1961
Primary view of Health and Safety Laboratory Fallout Program Quarterly Summary Report: June 1, 1961 - September 1, 1961
Hardy, Edward P., Jr.; Rivera, Joseph & Frankel, Robert
October 1, 1961
Primary view of Health and Safety Laboratory Fallout Program Quarterly Summary Report: September 1, 1960 - December 1, 1960
Hardy, Edward P., Jr.; Rivera, Joseph & Frankel, Robert
January 9, 1961
Primary view of Health and Safety Laboratory Fallout Program Quarterly Summary Report: December 1, 1960 - March 1, 1961
Hardy, Edward P., Jr.; Rivera, Joseph & Frankel, Robert
April 1, 1961
Primary view of Health and Safety Laboratory Fallout Program Quarterly Summary Report: September 1, 1961 - December 1, 1961
Hardy, Edward P., Jr.; Rivera, Joseph & Frankel, Robert
December 30, 1961
Primary view of An Evaluation of Reactor Concepts for Use As Separate Steam Superheaters
Lennox, D. H.; MacFarlane, D. R.; Brubaker, R. C.; Martinec, E. L.; Rohde, R. R.; Toppel, B. J. et al.
October 1961
Primary view of A Report on Some Attempts to Cast Centrifugally Fuel Elements of Small Diameter
Yaggee, F. L.
March 1961
Primary view of Uranium-Bismuth In-Pile Corrosion Test Loop: Radiation Loop No. 1
Waide, C. H.; Kukacka, L. E.; Meyer, R. A.; Milau, J.; Klein, J. H.; Chow, J. G. Y. et al.
May 1961
Primary view of A Study of the Feasibility of a Small Scale Reprocessing Plant for the Dresden Nuclear Power Station
Schneider, H.; Fletcher, R. D.; Codding, J. W.; Bearden, R. G.; Erickson, E. E.; Horn, S. J. et al.
April 28, 1961
Primary view of The Design, Installation, and Testing of the Gas-Cooled Reactor UOâ‚‚ Irradiation Experiment at the NRTS
Porter, E. H.
September 8, 1961
Primary view of Corn Pone: A Multigroup, Multiregion Reactor Code
Kinney, W. E. & Coveyou, R. R.
1961?
Primary view of Army Gas-Cooled Reactor Systems Program Semiannual Progress Report: July 1 - December 31, 1960
Aerojet-General Corporation
February 22, 1961
Primary view of Gas-Cooled Reactor Project Quarterly Progress Report: December 1960
Oak Ridge National Laboratory
1961
Primary view of Gas-Cooled Reactor Project Quarterly Progress Report: March 1961
Oak Ridge National Laboratory
1961
Primary view of Gas-Cooled Reactor Project Quarterly Progress Report: June 1961
Oak Ridge National Laboratory
1961
Primary view of Gas-Cooled Reactor Project Quarterly Progress Report: September 1961
Oak Ridge National Laboratory
1961
Primary view of The Thermal Hydraulics Laboratory at Hanford
Batch, J. M.; Toyoda, K. G. & Hanthorn, H. E.
November 1961
Primary view of The RBU Reactor-Burnup Code: Formulation and Operation Procedures
Triplett, J. R.; Merrill, E. T. & Burr, J. R.
July 1961
Primary view of Army Gas-Cooled Reactor Systems Program Semiannual Progress Report: January 1 - June 30, 1961
Aerojet-General Corporation
August 10, 1961
Primary view of Plutonium Spike Fuel Elements for the Plutonium Recycle Test Reactor: Part 2 - The Mark 1-H
Sharp, R. E.
March 1961
Primary view of Oak Ridge National Laboratory Intrumentation and Controls Division Annual Progress Report: 1960
Oak Ridge National Laboratory. Instrumentation and Controls Division.
February 3, 1961
Primary view of Superposition of Forced and Diffusive Flow in a Large-Pore Graphite
Evans, R. B., III; Truitt, J. & Watson, G. M.
1961
Primary view of Sulfex Process: Engineering-Scale Semicontinuous Decladding of Unirradiated Stainless Steel-Clad UO2 and UO2-ThO2
Finney, B. C. & Hannaford, B. A.
April 4, 1961
Primary view of Fabrication Development of UO2-Stainless Steel Composite Fuel Plates for core B of the Enrico Fermi Fast Breeder Reactor
Cherubini, J. H.; Beaver, R. J. & Leitten, C. F., Jr.
April 18, 1961
Back to Top of Screen