Search Results

Primary view of Numerical Results for EGCR Moderator-Element Stress Problems
Hulbert, Lewis E. & Redmond, Robert F.
July 3, 1961
Primary view of Failure Test of a Double Chambered NaK-Filled Irradiation Capsule
Kosut, B. S.; Leggett, R. D. & Marshall, R. K.
September 1961
Primary view of Final Design Report: DR-1 Gas Loop
Baars, R. E.
March 1961
Primary view of Oak Ridge National Laboratory Intrumentation and Controls Division Annual Progress Report: 1960
Oak Ridge National Laboratory. Instrumentation and Controls Division.
February 3, 1961
Primary view of Superposition of Forced and Diffusive Flow in a Large-Pore Graphite
Evans, R. B., III; Truitt, J. & Watson, G. M.
1961
Primary view of Fabrication Development of UO2-Stainless Steel Composite Fuel Plates for core B of the Enrico Fermi Fast Breeder Reactor
Cherubini, J. H.; Beaver, R. J. & Leitten, C. F., Jr.
April 18, 1961
Primary view of Inline Densimeter for Pulsed Column Liquid Density Pulse Amplitude, and Pulse Frequency Measurements
Mackey, T. S.
July 19, 1961
Primary view of Polfit II, an IBM 7090 Program for Polynomial Least Squares Fitting
Lietzke, M. P.
April 24, 1961
Primary view of Large-Scale Slurry-Circulation System, 300-SM
Parsly, L. F., Jr.; Falkenberry, H. L.; Harley, P. H.; Miller, I. M. & Kenyon, V. L.
December 21, 1961
Primary view of Evaluation of Ultimate Disposal Methods for Liquid and Solid Radioactive Wastes: Part 2, Conversion to Solid by Pot Calcination
Perona, J. J.; Bradshaw, R. L.; Roberts, J. T. & Blomeke, J. O.
October 16, 1961
Primary view of Mathematics Panel: Annual Progress Report for Period Ending December 31, 1960
unknown creator
April 6, 1961
Primary view of Molten-Salt Reactor Program Progress Report, August 1, 1960 to February 28, 1961
Oak Ridge National Laboratory
June 27, 1961
Primary view of Thermonuclear Division Semiannual Progress Report, January 31, 1961
Oak Ridge National Laboratory
May 31, 1961
Primary view of Spectral Shift Control Reactor Design and Economic Study
Mars, D. & Gans, D., Jr.
December 1961
Primary view of Thermonuclear Project Semiannual Progress Report: for Period Ending July 31, 1960
unknown creator
January 13, 1961
Primary view of Experimental Stress Analysis of EGCR Pressure Vessel
Greenstreet, B. L.; Holland, R. W.; Maxwell, R. L.; Witt, F. J.; Shobe, L. R. & LaVerne, M. E.
1961
Primary view of Chemical Technology Division Annual Progress Report, May 31, 1961
Oak Ridge National Laboratory. Chemical Technology Division.
September 21, 1961
Primary view of Health Physics Division Annual Progress Report, July 31, 1961
Oak Ridge National Laboratory. Health Physics Division.
October 31, 1961
Primary view of Heat Transfer Calculations for the PRTR Pressurized Gas-Cooled Loop Facility
Muraoka, J.
June 1961
Primary view of Evaluation of Iron- and Nickel-Base Alloys for Medium and High Temperature Reactor Applications, Part 1
Pessl, H. J.
February 1961
Primary view of Economic Evaluation of a 300-Mw(e) Supercritical Pressure Power Reactor
Harty, H.; Regimbal, J. J.; Toyoda, K. G. & Widrig, R. D.
June 1961
Primary view of Plutonium Spike Fuel Elements for the Plutonium Recycle Test Reactor: Part 1 - The Mark 1-G
Freshley, M. D.
March 1961
Primary view of Pneumatic Injection Casting of Aluminum-Plutonium Fuel Elements
Koler, R. K.
April 1961
Primary view of Metallographic Study of the Annealing Behavior of Aluminum-Silicon Eutectic Alloy
Todd, R. H.
June 1961
Back to Top of Screen