Search Results

Primary view of 100-K Area Downcomer Test Data Project CGI-883
Hutton, P. H.
January 10, 1961
Primary view of CHARGING AND DISCHARGING OF DEMINERALIZER RESINS. CORE I, SEED 2. Test Results (T-612085). Section 1
unknown creator
January 10, 1961
Primary view of Measurement of Coefficients of Reactivity at Power Core I Seed 2
unknown creator
January 10, 1961
Primary view of NON-DESTRUCTIVE TESTING OF STAINLESS-CARBON STEEL WELDS. CORE I, SEED 2. Section 2. Test Results T-641300
unknown creator
January 10, 1961
Primary view of Plexiglas Reflected Assemblies of Plutonium
Schuske, C.L .; Smith, D. F. & Bell, C. L.
January 10, 1961
Primary view of Proposal for charging heat treatment test elements GEH-10-44 & 45
Kemper, R. S. & Young, F. E.
January 10, 1961
Primary view of The Inhalation Toxicity of Indium Sesquioxide in the Rat
Leach, L. J.; Scott, J. K.; Armstrong, R. D.; Steadman, L. T. & Maynard, E. A.
February 10, 1961
Primary view of E-N and blanket conversions from analysis of tubes irradiated at H
Lang, L. W. & Nechodom, W. S.
February 10, 1961
Primary view of SOME EXPERIENCES IN THE WELD FABRICATION OF REFRACTORY METALS
Thompson, E.G.
February 10, 1961
Primary view of Fission-Product Plateout From a Helium Gas Stream
Johnson, D. E.; Tobin, J. M. & Buchanan, J. D.
March 10, 1961
Primary view of A Method of Determining the Intermediate Energy Neutron Dose
Hankins, D. E.
March 10, 1961
Primary view of Tensile Properties of Pyrolytic Graphite to 5000 F
Kotlensky, W. V. & Martens, H. E.
March 10, 1961
Primary view of Critical Path Scheduling in Maintenance
Gritzner, C. L.; Jones, J. P. & Ellis, J. M.
April 10, 1961
Primary view of Examinations of Pump Impellers From Sodium and Fused Salt Pump Endurance Tests
DeVan, J. H.
April 10, 1961
Primary view of THE SNAP II POWER CONVERSION SYSTEM TOPICAL REPORT NO. 14. MERCURY MATERIALS EVALUATION AND SELECTION
Nejedlik, James F.
April 10, 1961
Primary view of Supplement A to PT-IP-183-A-98-FP: Evaluation of projection fuel elements for use in K process tubes
Clinton, M. A.
April 10, 1961
Primary view of Accountability equations for plutonium and tritium yields for PT-IP-305-C at 105-H
Nechodom, W. S.
May 10, 1961
Primary view of THE RECOVERY OF FISSION PRODUCT RARE EARTH SULFATES FROM PUREX 1WW
Wheelwright, E.J. & Swift, W.H.
May 10, 1961
Primary view of Final report on production test IP-289-I, Supplement 1, H reactor export flow test
Cremer, B. R.
July 10, 1961
Primary view of PM-1 Nuclear Power Plant Program: 9th Quarterly Progress Report, March 1, 1961 to May 31, 1961
O'Brien, J. F.
July 10, 1961
Primary view of Specification and performance summary for reference engines (vacuum conditions)
unknown creator
July 10, 1961
Primary view of Study of Factors Influencing Ductility of Iron-Aluminum Alloys. Monthly Letter Report No. 1, June 1, 1961-November 30, 1961
Rauscher, G. P., Jr. & Nachman, J. F.
July 10, 1961
Primary view of Summary of the Operational Status of Reactor Control Instrumentation, Report No. 2
Stewart, S. L.
July 10, 1961
Primary view of Supplement A to PT-IP-263-A-FP evaluation of chemically nickel plated fuel elements
Clinton, M. A.
July 10, 1961
Back to Top of Screen