Search Results

Primary view of 12" SODIUM FLOW CONTROLLER. PERMANENT MAGNET COUPLING. MAGNETIC CALCULATION MANUFACTURE AND TEST RESULTS
Flator, H.E.
August 18, 1961
Primary view of 40-tube overbore facility location, C Reactor
Nilson, R.: Nechodom, W. S.
April 19, 1961
Primary view of 100-C water plant
Agar, J. D.
February 20, 1961
Primary view of 100-K Area Downcomer Test Data Project CGI-883
Hutton, P. H.
January 10, 1961
Primary view of 105-C overbore 40 tube test process tube assembly flow and pressure drop calibration test
Etheridge, E. L.
July 6, 1961
Primary view of 105-C overboring thirteen tube outage, March 6, 1961--March 10, 1961
Munro, C. A.
March 24, 1961
Primary view of 1A HEAT EXCHANGER LEAK TEST. CORE I, SEED 2. Test Evaluation. Section 2
unknown creator
July 24, 1961
Primary view of 1B HEAT EXCHANGER LEAK TEST. CORE I, SEED 1. Test Results
unknown creator
February 24, 1961
Primary view of 2000 KILOWATT SODIUM TEST FACILITY. Project Description and Progress Reports, June 30, 1958 through September 30, 1959
Whinery, L.A.
March 1, 1961
Primary view of ACCEPTOR DOPANTS FOR LEAD TELLURIDE
McCaldin, J.O.
December 1, 1961
Primary view of Accountability equations for plutonium and tritium yields for PT-IP-305-C at 105-H
Nechodom, W. S.
May 10, 1961
Primary view of Activity Build-Up Control by High pH Coolant. A Literature Survey
Bergen, C. R.
January 23, 1961
Primary view of Adsorption of Krypton and Xenon by Various Materials
Lloyd, M. H. & McNees, R. A.
December 1, 1961
Primary view of Advanced Engineering Preliminary Program Planning, Rough Draft
Towle, H.C.
April 20, 1961
Primary view of Aerothermodynamics, Comprehensive Technical Report, Direct Air Cycle, General Electric's Air Craft Nuclear Propulsion Program
Noyes, R. N.
December 6, 1961
Primary view of Air blast studies with animals. Part II.
Anderson, R. S.; Stemler, F. W. & Rogers, E. B.
April 1, 1961
Primary view of Air Lift Performance at Low Liquid Rates Using Oversized Piping and Lateral Runs
Chamberlain, H. V.
October 10, 1961
Primary view of Air Pulser for H-1 Column
Bruns, L.E.
March 1, 1961
Primary view of AIRCRAFT NUCLEAR PROPULSION DEPARTMENT NUCLEAR SAFETY GUIDE
Pryor, W.A.
June 1, 1961
Primary view of Aircraft Nuclear Propulsion Project Semiannual Progress Report for Period Ending April 30, 1961
unknown creator
July 17, 1961
Primary view of Amine Extraction of Plutonium From Nitric Acid Solutions Loading and Stripping Experiments
Wilson, A. S.
January 19, 1961
Primary view of Analog program in reactor speed of control studies
Cameron, W. D. & Tiller, R. E.
June 14, 1961
Primary view of Analog simulation of VSR withdrawal rates
Nilson, R.
July 6, 1961
Primary view of Analog to digital converter system for temperature monitoring -- B, C, D, DR, F, and H reactors
Ballowe, J. W.
March 23, 1961
Back to Top of Screen