Search Results

Primary view of B-Plant fission product flowsheets: Part 2
Rey, G.
September 29, 1961
Primary view of Design Criteria for Irradiated Vessels Task 6.0 Summary Report
McLaughlin, D. W.
September 29, 1961
Primary view of Numerical results of production test IP-326-I, low flow calibration tests at DR and C reactors, and of production test IP-395-I, removal of high tank discharge line strainer gates at B, D, and F reactors
Benson, J. L.
September 29, 1961
Primary view of Photoelastic study: KIWI-B pressure vessel nozzle end
Smith, D. E.
September 29, 1961
Primary view of Reactivity and graphite temperature effects of a helium-nitrogen atmosphere. Final report of PT IP-358-AC
Bailey, G. F.
September 29, 1961
Primary view of Small Power Reactor Projects of the United States Atomic Energy Commission
unknown creator
September 28, 1961
Primary view of Design Properties for Graphite
Hoppe, A.W.
September 27, 1961
Primary view of NPR Reactor shield calculations
Peterson, E. G.
September 27, 1961
Primary view of I. STUDY OF THE KINETICS OF Pu(IV) ELUTION FROM PERMUTIT SK RESIN, 40-70 MESH, AT 60 BY 0.6 M NITRIC ACID. II. STUDY OF RESIN REGENERATION BY 7.2 M NITRIC ACID. III. CALCULATION FOR A PLUTONIUM PURIFICATION COLUMN OF 40-70 MESH PERMUTIT SK
Calleri, G.; Geoffroy, A.; Franssen, F. & Demonie, J.
September 27, 1961
Primary view of Glossary and definitions. Space, missile, and nuclear terminology
unknown creator
September 25, 1961
Primary view of LOW LEVEL WASTE TREATMENT BY ION-EXCHANGE, II. USE OF A WEAK ACID, CARBOXYLIC-&HENOLIC ION-EXCHANGE RESIN
Holcomb, R.R. & Roberts, J.T.
September 25, 1961
Primary view of Low level waste treatment by ion-exchange. II. Use of a weak acid, carboxylic-phenolic ion-exchange resin
Holcomb, R.R. & Roberts, J.T.
September 25, 1961
Primary view of PILOT PLANT SHUTDOWN AND Pu-Al PROCESSING
Bresee, J.C.
September 25, 1961
Primary view of Summary Nuclear Calculations for the SM-2 Core 1
Fried, B. E.; Beam, R. H. & Bobe, P. E.
September 25, 1961
Primary view of B and D downcomer prototype data
Corley, J. P.
September 22, 1961
Primary view of Interim Report on the Development of an Air Pulser for Pulse Column Application
Weech, M. E.; P'Pool, R. S. & MacQueen, D. K.
September 22, 1961
Primary view of Radioactivation Analysis
Leddicotte, G. W.
September 22, 1961
Primary view of Chemical Processing Department Monthly Report: August 1961
Hanford Atomic Products Operation. Chemical Processing Department.
September 21, 1961
Primary view of CHEMICAL TECHNOLOGY DIVISION ANNUAL PROGRESS REPORT FOR PERIOD ENDING MAY 31, 1961
unknown creator
September 21, 1961
Primary view of Chemical Technology Division Annual Progress Report, May 31, 1961
Oak Ridge National Laboratory. Chemical Technology Division.
September 21, 1961
Primary view of Performance characteristics modified low lift pumps 100-K Area
Keene, L. M.
September 21, 1961
Primary view of Status of the High-Temperature Gas-Cooled Reactor
LeClair, T. G.
September 21, 1961
Primary view of Ecological Sampling and Meteorological Calculation of Fallout on Forests Near Oak Ridge
Olson, J.S.
September 20, 1961
Primary view of Experimental boiling burnout conditions for Hanford production reactors
Waters, E. D. & Batch, J. M.
September 20, 1961
Back to Top of Screen