Search Results

open access

Radiochemistry for the rupture of Zircaloy-2 clad heavy-walled tubular fuel element in KER Loop-3

Description: On the 0000 -- 0800 shift, December 9, 1960, the delayed neutron monitor on KER Loop 3 gave a high coolant activity signal indicating a possible fuel element failure in this loop. KE Reactor was shut down immediately thereafter. This report is being written to summarize the events pertinent to this KE Reactor scram and to discuss the results and significance of data from analyses on coolant and coupon samples taken from the KER Loop 3 system.
Date: August 21, 1961
Creator: Perrigo, L. D.
Partner: UNT Libraries Government Documents Department
open access

Chemical Processing Department Monthly Report: July 1961

Description: This report, for July 1961 from the Chemical Processing Department at HAPO, discusses the following: Production operation; Purex and Redox operation; Finished products operation; maintenance; Financial operations; facilities engineering; research; employee relations; weapons manufacturing operation; and safety and security.
Date: August 21, 1961
Creator: Hanford Atomic Products Operation. Chemical Processing Department.
Partner: UNT Libraries Government Documents Department
Back to Top of Screen