Search Results

Primary view of A New Process for the Production of Fresh Water From Sea Water
Svanoe, Hans; Swiger, W. F.; Colton, J. S.; Jewett, J. E. & Margiloff, I. B.
June 1961
Primary view of Molten-Salt Reactor Program Progress Report, August 1, 1960 to February 28, 1961
Oak Ridge National Laboratory
June 27, 1961
Primary view of Heat Transfer Calculations for the PRTR Pressurized Gas-Cooled Loop Facility
Muraoka, J.
June 1961
Primary view of Economic Evaluation of a 300-Mw(e) Supercritical Pressure Power Reactor
Harty, H.; Regimbal, J. J.; Toyoda, K. G. & Widrig, R. D.
June 1961
Primary view of Metallographic Study of the Annealing Behavior of Aluminum-Silicon Eutectic Alloy
Todd, R. H.
June 1961
Primary view of Engineering Test Reactor Critical Facility Control System Manual
Meichle, F. A.
June 23, 1961
Primary view of SL-1 Annual Operating Report: February, 1960-January 3, [1961]
unknown creator
June 15, 1961
Primary view of Explanation of the high temperature obtained in the Intermediate Power Test
Barnett, C.
June 16, 1961
Primary view of Investigation of Performance of Concrete and Concreting Materials Exposed to Natural Weathering, Volume 2: Completed Investigations
Waterways Experiment Station (U.S.)
June 1961
Primary view of The Development of Special Beryllium Oxide Compositions
Shearer, W. B.
June 30, 1961
Primary view of Reactor Flow Studies : Full Scale Model Flow Tests
Taylor, W. J.; Starr, I. & Baer, R. L.
June 1961
Primary view of SNAP Programs Quarterly Progress Report, Task 8--Stontium-90 Fuled Thermoelectric Generator Development: Number 1, November 1, 1960-January 31, 1961
unknown creator
June 1961
Primary view of Radiation Safety and Control Training Manual
Oak Ridge National Laboratory
June 1, 1961
Primary view of Engineering Evaluation Studies: Heavy Water Moderated Power Reactor Plants
Chittenden, W. A. & Hoveke, G. F.
June 30, 1961
Primary view of Geologic Summary of the Appalachian Basin: With Reference to the Subsurface Disposal of Radioactive Waste Solutions
Colton, George Willis
June 1961
Primary view of CARBIDE FUEL DEVELOPMENT. Progress Report Period, February 1, 1961 to April 30, 1961
Strasser, A. & Taylor, K.
June 1, 1961
Primary view of INCR-8-Graphite-Fused Salt Compatibility Test
Schulze, R. C.; Cook, W. H.; Evans, R. B., III & Crowley, J. L.
June 15, 1961
Primary view of Synthesis and Fabrication of Refractory Uranium Compounds. First Quarterly Report, March 1 Through May 31, 1961
Taylor, K. M. & McMurtry, C. H.
June 29, 1961
Primary view of The Performance of a Motor, a Switch, and Two Types of Pressure Pickup in a High-Gamma-Flux Environment
Ayer, J. E. & Pokorny, G. J.
June 1, 1961
Primary view of MOLTEN-SALT REACTOR PROGRAM PROGRESS REPORT FOR PERIOD FROM AUGUST 1, 1960, TO FEBRUARY 28, 1961
unknown creator
June 27, 1961
Primary view of QUARTERLY STATUS REPORT ON LAMPRE PROGRAM FOR PERIOD ENDING MAY 20, 1961
unknown creator
June 1, 1961
Primary view of SUMMARY REPORT ON THE HAZARDS OF THE UTR TEST REACTOR. ATL Job 5164
Battles, D.W. & Joki, E.G.
June 1, 1961
Primary view of LABORATORY DEVELOPMENT OF A TRIBUTYL PHOSPHATE SOLVENT EXTRACTION PROCESS FOR PROCESSING 20% ENRICHED URANIUM ALLOY FUEL
Goode, J.H. & Flanary, J.R.
June 1, 1961
Primary view of THE BEHAVIOR OF ELECTROLYTIC SOLUTIONS AT ELEVATED TEMPERATURES AS DERIVED FROM CONDUCTANCE MEASUREMENTS
Wright, J. M.; Lindsay, Jr. W. T. & Druga, T. R.
June 1, 1961
Back to Top of Screen