Search Results

Primary view of A Status Report on Reactivity Coefficients in Fast Reactors and Methods of Investigating Their Effects on Reactor Stability
Agresta, J.
March 1, 1961
Primary view of Research project, Contract CA-264, chemical milling of counterbore recesses in the uranium wall of Zircaloy-2 clad uranium tubes. Final report
Atkins, D. C. Jr.
March 28, 1961
Primary view of Conceptual Design of a Coupled Breeding Superheating Reactor, CBSR
Avery, R.; Dewey, W. V.; Rohde, R. & Toppel, B. J.
March 1, 1961
Primary view of Final Design Report: DR-1 Gas Loop
Baars, R. E.
March 1961
Primary view of Analog to digital converter system for temperature monitoring -- B, C, D, DR, F, and H reactors
Ballowe, J. W.
March 23, 1961
Primary view of Adsorption of Uranium on Hydrous Zirconium Oxide from Uranyl Sulfate Solutions at Elevated Temperatures
Banter, J. C. & Wheeler, S. H.
March 1, 1961
Primary view of Aeroradioactivity Survey and Areal Geology of the Oak Ridge National Laboratory Area, Tennessee and Kentucky (ARMS-I)
Bates, Robert G.
March 1961
Primary view of Summary of HRT Run 19
Beall, S.E.
March 16, 1961
Primary view of HYDRAULIC TESTS OF A PROTOTYPE HALLAM FUEL ELEMENT (SU-9) TO BE TESTED IN SRE
Beeley, R. J.
March 13, 1961
Primary view of REVIEW OF INVESTIGATIONS PERTINENT TO THE PREDICTION OF THE THERMAL BEHAVIOR OF FAST REACTORS UNDER ABNORMAL OPERATING CONDITIONS
Beers, F.E.
March 15, 1961
Primary view of Dislocation Substructures in Deformed and Recovered Molybdenum
Benson, R.; Thomas, G. & Washburn, J.
March 1, 1961
Primary view of Dislocation Substructures In Deformed And Recovered Molybdenum
Benson, R.; Thomas, G. & Washburn, J.
March 1961
Primary view of Re-evaluation of metal performance levels of C-II-N and C-II-E material
Bloomstrand, R. R.
March 3, 1961
Primary view of Chemical Development Section C Progress Report for October-November 1960
Brown, K. B.
March 3, 1961
Primary view of Air Pulser for H-1 Column
Bruns, L.E.
March 1, 1961
Primary view of Feasibility Study of a New Mass Flow System : Quarterly Report No. 3 Covering the Period from December 1, 1960 to February 28, 1961
Burgwald, G. M.; Stone, C. A. & Genthe, William K.
March 20, 1961
Primary view of FEASIBILITY STUDY OF A NEW MASS FLOW SYSTEM. Quarterly Report No. 3 covering Period December 1, 1960 to February 28, 1961
Burgwald, G.M.
March 20, 1961
Primary view of Experimental Evaluation of the Fallout-Radiation Protection Afforded by a Southwestern Residence
Burson, Z.; Parry, D. & Borella, H.
March 14, 1961
Primary view of THE DYNAMIC PINCH AS A HIGH-INTENSITY LIGHT SOURCE FOR OPTICAL MASER PUMPING
Colgate, S. A. & Trivelpiece, A. W.
March 31, 1961
Primary view of Ionization in Crossed Electric and Magnetic Fields
Colgate, Stirling A.
March 15, 1961
Primary view of Hazards Summary Report for the SM-1 Core Temperature and Flow Instrumentation: Task XIV
Coombe, J. R.; Brondel, J. O.; Lee, D. H. & Matthews, F. T.
March 30, 1961
Primary view of Hazards Report for the SM-1 Core II With Special Components
Coombe, J.; Lee, D.; Segalman, I. & Robertson, R.
March 30, 1961
Primary view of A Reliability Improvement Program Planning Report for the SNAP 10A Space Nuclear Power Unit
Coombs, M. G.; Smith, C. K. & Wilson, L. A.
March 14, 1961
Primary view of PROGRESS RELATING TO CIVILIAN APPLICATIONS DURING FEBRUARY 1961
Dayton, R. W. & Tipton, C. R., Jr.
March 1, 1961
Back to Top of Screen