This system will be undergoing maintenance November 19th between 9:00AM and 12:00PM CST.

Search Results

Primary view of Heavy Water Power Reactor Program Monthly Report: June 1960
U.S. Atomic Energy Commission. Savannah River Operations Office.
1960-07~
Primary view of Power Reactor Program. Progress Report to E. I. du Pont de Nemours and Company for the Period May 1, 1960 through May 31, 1960
Isserow, S.; White, A. M.; Sawyer, H. F.; Donaldson, A. D.; Richmond, W. J.; Green, H. M. et al.
July 12, 1960
Primary view of Power Reactor Program. Progress Report to E. I. du Pont de Nemours and Company for the Period March 1, 1960 through March 31, 1960
Isserow, S.; Kaufman, D. F.; Richmond, W. J.; Green, H. M. & Jenkins, R. G.
July 6, 1960
Primary view of Effect of the Savannah River Plant on Environmental Radioactivity: Quarterly Report April Through June 1960
Du Pont Company. Health Physics Section
1960-07~
Primary view of Cesium-137 In Milk
Vohra, K. G.; Bhatnagar, V. S.; Mishna, U. C. & Ragupathy, S.
July 1960
Primary view of Strontium an Calcium Metabolism in Man, Final Report
Schulert, Arthur R.
July 13, 1960
Primary view of Consolidated Edison Thorium Reactor Critical Experiments with Oxide Fuel Pins
Batch, M. L. & Snidow, N. L.
July 1960
Primary view of Consolidated Edision Thorium Reactor Physics Design
Barringer, H. S.; Flickinger, R. B. & Spetz, S. W.
July 1960
Primary view of Consolidated Edison Thorium Reactor:  Reactor Vessel Internal Components Design
Ficor, J.; Collings, D. M.; Sandrock, R. J. & Kalen, D. D.
July 1960
Primary view of Control Blade Worth by Partial Water Height and Soluble Boron Methods
MacKinney, Arland L. & Ball, Russell M.
July 1960
Primary view of Thermal and Hydraulic Design of the Consolidated Edison Thorium Reactor
Ferrell, J. K. (James K.); Flora, H. E.; Hostetler, D. R.; Stanek, L. J. & Vannoy, W. M.
July 1960
Primary view of Study of Remote Military Power Applications: Report 11, U.S. Naval Air Facility, McMurdo Sound, Antarctica
unknown creator
July 1960
Primary view of Study of Remote Military Power Applications: Byrd Station Antarctica
Henry J. Kaiser Company
July 1960
Primary view of Study of Remote Military Power Applications: Pole Station Antarctica
Henry J. Kaiser Company
July 1960
Primary view of Study of Remote Military Power Applications: Report 6, Fourth U.S. ASA Field Station Asmara, Eritrea
unknown creator
July 1960
Primary view of Study of Remote Military Power Applications: Report 8, Nike-Zeus Far Site
unknown creator
July 1960
Primary view of Study of Remote Military Power Applications: Report 10, Atlantic Barge
unknown creator
July 1960
Primary view of Study of Remote Military Power Applications: Report 7, Super Sage Rocky Mountains Area
unknown creator
July 1960
Primary view of Study of Remote Military Power Applications: Report 9, Inchon, Korea
unknown creator
July 1960
Primary view of Study of Remote Military Power Applications: Report 5, NORAD
unknown creator
July 1960
Primary view of Study of Remote Military Power Applications: Report 1, Summary
unknown creator
July 1960
Primary view of Study of Remote Military Power Applications: Report 3, Guam, Mariana Islands
unknown creator
July 1960
Primary view of Study of Remote Military Power Applications: Hypothetical Site
unknown creator
July 1960
Primary view of Study of Remote Military Power Applications: Report 4, Thule Air Base, Greenland
unknown creator
July 1960
Back to Top of Screen