Search Results

open access

Study of Remote Military Power Applications: Report 8, Nike-Zeus Far Site

Description: From introduction: The study is essentially an economic evaluation of the construction and operation of nuclear power plants at several designated military installations where increased power generating capabilities of 5 to 40 mwe may be required by the Government during the period 1963 through 1970.
Date: July 1960
Partner: UNT Libraries Government Documents Department
open access

Study of Remote Military Power Applications: Report 9, Inchon, Korea

Description: From introduction: The study is essentially an economic evaluation of the construction and operation of nuclear power plants at several designated military installations where increased power generating capabilities of 5 to 40 mwe may be required by the Government during the period 1963 through 1970.
Date: July 1960
Partner: UNT Libraries Government Documents Department
open access

Study of Remote Military Power Applications: Report 11, U.S. Naval Air Facility, McMurdo Sound, Antarctica

Description: From introduction: The study is essentially an economic evaluation of the construction and operation of nuclear power plants at several designated military installations where increased power generating capabilities of 5 to 40 mwe may be required by the Government during the period 1963 through 1970.
Date: July 1960
Partner: UNT Libraries Government Documents Department
open access

Study of Remote Military Power Applications: Hypothetical Site

Description: From introduction: The study is essentially an economic evaluation of the construction and operation of nuclear power plants at several designated military installations where increased power generating capabilities of 5 to 40 mwe may be required by the Government during the period 1963 through 1970.
Date: July 1960
Partner: UNT Libraries Government Documents Department
open access

Study of Remote Military Power Applications: Report 1, Summary

Description: From introduction: The study is essentially an economic evaluation of the construction and operation of nuclear power plants at several designated military installations, where increased power generating capabilities of 5 to 10 mwe may be required by the Government for the period 1963 through 1970.
Date: July 1960
Partner: UNT Libraries Government Documents Department
open access

Study of Remote Military Power Applications: Report 2, Okinawa, Ryukyu Islands

Description: From introduction: This study is essentially an economic evaluation of the construction and operation of nuclear power plants at several designated military installations where increased power generating capabilities of 5 to 40 mwe may be required by the Government for the period 1963 through 1970.
Date: July 1960
Partner: UNT Libraries Government Documents Department
open access

Study of Remote Military Power Applications: Report 3, Guam, Mariana Islands

Description: From introduction: The study is essentially an economic evaluation of the construction and operation of nuclear power plants at several designated military installations where increased power generating capabilities of 5 to 40 mwe may be required by the Government during the period 1963 through 1970.
Date: July 1960
Partner: UNT Libraries Government Documents Department
open access

Study of Remote Military Power Applications: Report 4, Thule Air Base, Greenland

Description: From introduction: The study is essentially an economic evaluation of the construction and operation of nuclear power plants at several designated military installations where increased power generating capabilities of 5 to 40 mwe may be required by the Government during the period 1963 through 1970.
Date: July 1960
Partner: UNT Libraries Government Documents Department
open access

Study of Remote Military Power Applications: Report 5, NORAD

Description: From introduction: The study is essentially an economic evaluation of the construction and operation of nuclear power plants at several designated military installations where increased power generating capabilities of 5 to 40 mwe may be required by the Government during the period 1963 through 1970.
Date: July 1960
Partner: UNT Libraries Government Documents Department
open access

Study of Remote Military Power Applications: Report 6, Fourth U.S. ASA Field Station Asmara, Eritrea

Description: From introduction: The study is essentially an economic evaluation of the construction and operation of nuclear power plants at several designated military installations where increased power generating capabilities of 5 to 40 mwe may be required by the Government during the period 1963 through 1970.
Date: July 1960
Partner: UNT Libraries Government Documents Department
open access

Study of Remote Military Power Applications: Report 10, Atlantic Barge

Description: From introduction: The study is essentially an economic evaluation of the construction and operation of nuclear power plants at several designated military installations where increased power generating capabilities of 5 to 40 mwe may be required by the Government during the period 1963 through 1970.
Date: July 1960
Partner: UNT Libraries Government Documents Department
open access

Evaluation of the Technical, Economic and Practical Feasibility of Radiation Preservation of Fish

Description: From abstract: Based on exploratory studies conducted over the last six years on the radiation-preservation of various marine species, it is apparent that low dose substerilization-radiation treatment of certain selected sea foods can provide advantages for the procurer, processor, distributor and consumer of edible marine products.
Date: 1960?
Creator: Proctor, Bernard E.; Goldblith, Samuel A.; Nickerson, John T. R. & Farkas, D. F.
Partner: UNT Libraries Government Documents Department
open access

Study of Remote Military Power Applications: Report 7, Super Sage Rocky Mountains Area

Description: From introduction: The study is essentially an economic evaluation of the construction and operation of nuclear power plants at several designated military installations where increased power generating capabilities of 5 to 40 mwe may be required by the Government during the period 1963 through 1970.
Date: July 1960
Partner: UNT Libraries Government Documents Department
Back to Top of Screen