Search Results

Primary view of Accelerator Beam Pulsing System With Extremely Wide Range of Pulse Lengths and Pulse Repetition Rates
Aaland, Kristian
June 28, 1960
Primary view of Aircraft Reactor Test Removal and Disassembly
Abbatiello, A. A. & McQuilkin, F. R.
1960?
Primary view of Isotopic Analysis of Boron as Trimethyl Borate
Abernathey, R. M.
January 28, 1960
Primary view of Temperature-Induced Stresses in Solids of Elementary Shape
Adams, Leason H. & Waxler, Roy M.
June 21, 1960
Primary view of Development test IP-342-AG increase of bulk outlet water temperature 105-DR
Adams, O. E. Jr.; Hedges, J. W. & Jones, S. S.
July 14, 1960
Primary view of Evaluation of Experiment Off-gas System for the EGCR-LITR Capsule Experiment
Adams, R. E. & Browning, W. E.
September 2, 1960
Primary view of Removal of Radioiodine From Air Streams by Activated Charcoal
Adams, R. E. & Browning, W. E., Jr.
April 1, 1960
Primary view of Comments on meeting with the seismic Working Group on Explosions on 15 June 1960 in Washington [with the Seismic Working Group on Explosions]
Adams, W. M.
June 29, 1960
Primary view of Project Cowboy : Final Report : Seismic Decoupling for Explosions in Spherical Cavities
Adams, William M. & Allen, DeWitt C.
August 1960
Primary view of Seismic Decoupling for Explosions in Spherical Cavities
Adams, William M. & Carder, Dean S.
September 30, 1960
Primary view of Final Report on the Pinot Experiment
Adelman, F. L.; Bacigalupi, C. M. & Momyer, F. F.
December 27, 1960
Primary view of Technical Feasibility and Economic Potential of the Variable Moderator Reactor: Final Report
Advanced Technology Laboratories
December 15, 1960
Primary view of Army Gas-Cooled Reactor Systems Program Semiannual Progress Report: July 1 - December 31, 1959
Aerojet-General Corporation
February 15, 1960
Primary view of Army Gas-Cooled Reactor Systems Program Semiannual Progress Report: January 1 - June 30, 1960
Aerojet-General Corporation
July 31, 1960
Primary view of Army Gas-Cooled Reactor Systems Program Semiannual Progress Report: January 1 - June 30, 1960
Aerojet-General Corporation
July 31, 1960
Primary view of Theoretical Feedback Analysis in Boiling Water Reactors
Akcasu, A. Ziya
October 1, 1960
Primary view of The Diffusion of Hydrogen in Zirconium Hydride
Albrecht, W. M. & Goode, W. D., Jr.
March 1, 1960
Primary view of The Decay of Neptunium-238
Albridge, R. G. & Hollander, J. M.
December 1, 1960
Primary view of Evaluation of Buried Conduits as Personnel Shelters
Albright, G. H.; LeDoux, J. C. & Mitchell, R. A.
July 14, 1960
Primary view of Control and Dynamics Performance of a Sodium Cooled Reactor Power System
Alco Products (Firm).
1960
Primary view of Intermediate Heat Exchanger and Steam Generator Final Design. Volume 1. Thermal & Mechanical Design
Alco Products (Firm).
September 30, 1960
Primary view of Intermediate Heat Exchanger and Steam Generator Final Design. Volume 2. Chemical & Stress Analysis
Alco Products (Firm).
September 30, 1960
Primary view of Intermediate Heat Exchanger and Steam Generator Final Design. Volume 3. Specifications
Alco Products (Firm).
September 30, 1960
Primary view of Intermediate Heat Exchanger and Steam Generator Final Design. Volume 4. Operation & Maintenance
Alco Products (Firm).
September 30, 1960
Back to Top of Screen