Search Results

open access

Strontium Program: Quarterly Summary Report, May 29, 1959

Description: From Abstract: "This report is one of a sequence of quarterly reports, each designed to up-date its predecessor beginning with HASL-42, "Environmental Contamination from Weapon Tests". Herein are presented data which have accrued since HASL-55. Levels of strontinum-90 in fallout, milk, air, water, vegetation, foods, and bone are given, based on data available from February 1, 1959 to May 20, 1959."
Date: May 29, 1959
Creator: Hardy, Edward P., Jr. & Klein, Stanley
Partner: UNT Libraries Government Documents Department
open access

Analysis of 100-K emergency water requirements after CGI-844 pump failure

Description: The demand plot has a 5-set, modified pump decay curve; it shows that 20,000 gpm emergency flow would be required within 80 seconds of complete pump power failure. Bases for the demand curve are constant bulk inlet temperature of 2 C, constant bulk outlet temperature of 95 C, K-3 I&E fuel elements, and initial reactor flow of 188,000 gpm.
Date: May 28, 1959
Creator: Corlett, R. F.
Partner: UNT Libraries Government Documents Department
open access

DEFUELING THE S2G REACTOR

Description: The defueling of the S2G Reactor which was conducted at the Electric Boat Division, General Dynamics Corporation Groton Connecticut during January 1959, is reported from the viewpoint of the participating personnel from Knolls Atomic Power Laboratory. The sequence of events is outlined, difficulties encountered during the operation are described, and conclusions of possible interest to other naval nuclear reactors are given (auth)
Date: May 28, 1959
Creator: Moore, C.V.
Partner: UNT Libraries Government Documents Department
open access

Increased production from deliberate discharge cycling

Description: Considerable production gains might be attained if each reactor discharged its entire flattened region during one scheduled outage instead of utilizing several outages for this purpose. Several of the older reactors are now discharging a high percentage of their flattened zones in a single outage and could be put into this type of operation with relatively little difficulty. Production gains may be possible through better flattening efficiency, a more favorable rupture rate effect, fewer non-eqā€¦ more
Date: May 28, 1959
Creator: Carter, R. D.
Partner: UNT Libraries Government Documents Department
open access

PROBLEMS IN ACCOUNTABILITY MEASUREMENTS ASSOCIATED WITH THE INTERIM CHEMICAL PROCESSING PROGRAM

Description: Available knowledge of precision limits in S.S. accountability measurements and/or calculations by reactor and chemical processing groups is surveyed and summarized. Experienee in comparisons of reactor (production and research) calculations vs. chemical plant accountability measurements is also reported. A general tentative conclusion is that available precisions ( plus or minus 0.54 to plus or minus 0.78%) in chemical plant measurements (bulk and analytical) for fissionable material accountabā€¦ more
Date: May 28, 1959
Creator: Arnold, E D & Gresky, A T
Partner: UNT Libraries Government Documents Department
open access

Problems in Accountability Measurements Associated with the Interim Chemical Processing Program

Description: Available knowledge of precision limits in S.S. accountability measurements and/or calculations by reactor and chemical processing groups is surveyed and summarizes. Experience in comparisons of reactor (production and research) calculations versus chemical plant accountability measurements is also reported. A general tentative conclusion is that available precisions (+/- 0.54 to +/- 0.78% ) in chemical plant measurements is also reported. A general tentative conclusion is that available precisā€¦ more
Date: May 28, 1959
Creator: Arnold, E. D. & Gresky, A. T.
Partner: UNT Libraries Government Documents Department
open access

Toy Top Plasma Injector

Description: Introduction: "It is the purpose of this note to describe the construction and operation of the plasma injectors used in the magnetic high compression experiments in progress at the Lawrence Radiation Laboratory at Livermore. As the investigations of these injections is still in progress, remarks concerning their operation or the characteristics of the injected plasma are of a tentative nature."
Date: May 28, 1959
Creator: Coensgen, F. H.; Cummins, W. & Sherman, A.
Partner: UNT Libraries Government Documents Department
open access

Toy Top Plasma Injector

Description: The construction and operation of the plasma injector, Toy Top, used ia the magnetic high compression experements in progess at the Lawrence Radiation Jab. at Livemore are described The essential part of the injector consists of a stack of deuterated titanium washers 3/4 in. O.D. and/2 in. I.D. Details of the construction are sbown (W.D.M.)
Date: May 28, 1959
Creator: Coensgen, F.; Cummins, W. & Sherman, A.
Partner: UNT Libraries Government Documents Department
open access

Volatility: Fluorinator Design FV-100, Zr-U Fuel Element Processing Phase

Description: Volatility Pilot Plant Mark III Fluorinator is a doublechamber type vessel, each chamber 2 1/2 ft by 16 in. outside diameter separated by a 5-in. pipe 15 in. long. ASME flanged and dished heads are used for the chamber tops and conical sections with a 60 deg apex angle for the chamber bottoms. A new furnace designed to maintain the complete lower chamber (molten salt+ freeboard) above melt temperature is to eliminate past experiences of salt solidification on the wall, heads, and in or on the iā€¦ more
Date: May 28, 1959
Creator: Ruch, J. B.
Partner: UNT Libraries Government Documents Department
open access

Volatility: Fluorinator Design FV-100, Zr-U Fuel Element Processing Phase

Description: Volstility Pilot Plant Mark III Fluorinator will be a double-chamber type vessel, each chamber 2-1/2ft. by 16in. o.d. separated by a 5 in. pipe 15 in. long. ASME flanged and dished heads will be used for the chamber tops and conical sections with a 60Āŗ apex angle for the chamber bottoms. A new furnace designed to maintain the complete lower chamber (molten salt + freeboard) above melt temperature will eliminate past experiences of salt solidification on the wall, heads, and in or on the internaā€¦ more
Date: May 28, 1959
Creator: Ruch, J. B.
Partner: UNT Libraries Government Documents Department
open access

Maritime Organic Moderated and Cooled Reactor

Description: Introduction: This document describes the results of a six-week conceptual design study of an organic moderated and cooled reactor (OMCR) power plant adapted to a Class T-7 tanker.
Date: May 27, 1959
Partner: UNT Libraries Government Documents Department
open access

Radiation decay data of various dummies and aluminums

Description: Sections of the dummies furnished by Radiological Engineering, Process Reactor Development Operation were machined into 1/4 inch diameter by 1 inch long cylinders and irradiated in the Quickie Facility at F area. The pieces were discharged directly into a holder one foot from the Beckman chamber. The transient time from in-pile to the chamber is approximately 30 seconds. The readings were taken using a Beckman chamber, Beckman Micro-Micro Ammeter and Recorder. This system has been calibrated wiā€¦ more
Date: May 27, 1959
Creator: DeMers, A. E. & Olson, W. B.
Partner: UNT Libraries Government Documents Department
open access

THE DEVELOPMENT OF A FLUIDIZED BED REACTOR FOR THE FLUOROX PROCESS: UNIT OPERATIONS MONTHLY STATUS REPORTS FOR THE PERIOD NOVEMBER 1958 THROUGH MAY 1959

Description: Results of four experimentul runs in the Fluorox fluidized bed reactor system are reported. The engineering feasibility of UF/sub 6/ production from UF/ sub 4/ by use of dry air of O/sub 2/, 2UF/sub 4/ + O/sub 2/ = UF/sub 6/+ UO/sub 2/ F/sub 2/, in an Inconel fluidized bed reactor at 800 to 850 deg C was demonstrated in two experimental tests in which greater than 90% of the theoretical amount of UF/sub 6/ was collected or measured. Two runs made with crude UF/sub 4/ (produced from unpurified mā€¦ more
Date: May 26, 1959
Creator: Bresee, J C; Horton, R W & Scott, C D
Partner: UNT Libraries Government Documents Department
open access

The Development of a Fluidized Bed Reactor for the Fluorox Process: Unit operations Monthly Status Reports for the Period November, 1958, Through May, 1959

Description: Results of four experiemental runs in the Fluorox fluidized bed reactor system are reported. The engineering feasibility of UF6 production from UF4 by use of dry air of O2, 2UF4 + O2 = UF6 + UO2F2, in an Inconel fluidized bed reactor at 800-850Ā°C was demonstrated in two experimental tests in which greater than 90% of the theoretical amount of UF6 was collected or measured. Two runs made with crude UF4 (produced from unpurified mill concentrate) as the feed material, showed that UF6 could be proā€¦ more
Date: May 26, 1959
Creator: Bresee, J. C.; Scott, C. D. & Horton, R. W.
Partner: UNT Libraries Government Documents Department
open access

Irradiation performance of coextruded enriched uranium fuel rod PT-IP-A172-A: Final report

Description: The proposed operating conditions for fuel elements to be charged into the NPR require the fuel to be of an extended surface geometry and maintain adequate strength and corrosion resistance in 300 C water. A contract was let to Nuclear Metals Inc. to produce by co-extrusion lengths of fuel rod containing both natural and 1.6% enriched uranium of irradiation quality for fabrication into fuel elements. The fuel rods used in the irradiation test represent the first enriched uranium rods coextrudedā€¦ more
Date: May 26, 1959
Creator: Claudson, T. T.
Partner: UNT Libraries Government Documents Department
open access

Sizes of U. S. Steam-Electric Plants

Description: At the present time, plants in the 100 to 500 Mw size range are more numerous and carry the greatest portion (over 50%) of the total steam-electric plant load in the US utillties industry. The contribution of plants of over 1,000-Mw capacity is increasing more rapidly than any other size classification and at present represents about 10% of the total capacity. By 1962 the TVA will have six plants with capacities of over 1,000-Mw. The largest steam-electric plant in the US is the TVA plant at Kiā€¦ more
Date: May 26, 1959
Creator: Robertson, R. C.
Partner: UNT Libraries Government Documents Department
open access

Sizes of U. S. Steam- Electric Plants

Description: At the present time, plants in the 100-500Mv size range are more numerous and carry the greatest portion (over 50%) of the total steam-electric plant load in the U.S. utilities industry. The contribution of plants of over 1,000-Mv capacity is increasing more rapidly than any other size clarification and at present represents about 10% of the total capacity. By 1962 the TVA will have six plants with capacities of over 1,000-Mv. The largest steam-electric plant in the U.S. is the TVA plant at Kinā€¦ more
Date: May 26, 1959
Creator: Robertson, R. C.
Partner: UNT Libraries Government Documents Department
open access

X-Ray Diffraction Analysis of Boron in Boron Carbide

Description: By applying the relationships between lattice parameters and composition in the solid solution range, a method was presented to analyze boron in boron carbide. The purpose was to establish a means of determining the boron composition in a boron carbide solid solution in the presence of excess carbon or boron. The different unit-cell dimensions sometimes reported for a given solid mixture are usually attributed to the existence of solid solutions. If the crystal lattice parameters vary linearly ā€¦ more
Date: May 26, 1959
Creator: Osika, L. M.
Partner: UNT Libraries Government Documents Department
open access

Army Gas-Cooled Reactor Systems Program Monthly Progress Report: April 1959

Description: Abstract: This monthly progress report covers the activities of the Army Gas-Cooled Reactor System Program for April 1959. The program includes a water-moderated heterogeneous reactor (Gas-Cooled Reactor Experiment I), a graphite-moderated homogeneous reactor (Gas-Cooled Reactor Experiment II), a mobile gas-cooled reactor (ML-1), and the coordination of the Gas Turbine Test Facility. [It reports] the progress of each project, the associated tests and data evaluation, the applicable design critā€¦ more
Date: May 25, 1959
Creator: Aerojet-General Corporation
Partner: UNT Libraries Government Documents Department
open access

Army Gas-Cooled Reactor Systems Program. Monthly Progress Report for April 1959

Description: The Army Gas Cooled Reactor System Program includes water moderated heterogeneous reactor (Gas Cooled Reactor Experiment I), a graphite moderated homogeneous reactor (Gas Cooled Reactor Experiment II), a mobile gas cooled reactor (ML-1), and the co ordination of thc Gas Turbine Test Facility. The progress of each project, the associated tests and data evaluation, the applicabie design criteria, and the fabrication of reactor components are briefly summarized. (For preceding period see IDO-28538ā€¦ more
Date: May 25, 1959
Partner: UNT Libraries Government Documents Department
open access

Artificial cooling of the Columbia River by dam regulation: Part 1

Description: In early July 1958, it appeared that Columbia River temperatures at HAPO would be near 24--50{degree}C by the end of August. River temperatures were averaging 40 to 50{degree}C above 1957 figures and were 3{degree} to 4{degree} above the ten year highs. It seemed desirable to examine the problem to determine if any corrective measure could be taken, since it was apparent that production losses were imminent. The large storage of cold water behind Grand Coulee Dam, normally untapped, was a sourcā€¦ more
Date: May 25, 1959
Creator: Kramer, H. A.
Partner: UNT Libraries Government Documents Department
Back to Top of Screen