Search Results

Primary view of Natural Uranium Sodium-Deuterium Reactors: Preliminary Design and Economic Analysis
Joseph, L.; Sofer, G. & Goldstein, L.
February 28, 1959
Primary view of Engineering Geology of Test Sites in Granite and Dolomite at Gold Meadows, Climax, and Dolomite Hill, Nevada Test Site, Nye County, Nevada: Preliminary Report
Gibbons, Anthony B.; Hinrichs, E. Neal; Dickey, D. D.; McKeown, F. A.; Poole, F. G. & Houser, F. N.
February 1959
Primary view of Geological Survey Investigations in the U12e.05 Tunnel, Nevada Test Site
Diment, William H.; Wilmarth, V. R.; Houser, F. N.; Dickey, D. D.; Hinrichs, E. Neal; Botinelly, Theodore et al.
February 1959
Primary view of Thermal Bowing of Core Subassemblies
De Stordeur, Arnold
February 20, 1959
Primary view of Blast biology: a study of the primary and tertiary effects of blast in open underground protective shelters. Project 33. 1 of Operation Plumbbob
Ricmond, D.R.; Taborelli, R.V. & Bowen, I.G.
February 1, 1959
Primary view of Chemical Processing Department Monthly Report: January 1959
Hanford Atomic Products Operation. Chemical Processing Department.
February 20, 1959
Primary view of Study of Electric Propulsion Systems for Space Travel: Interim Progress Report for July 1 to December 31, 1958
Fox, Robert H.
February 6, 1959
Primary view of Irradiation Processing Department monthly record report, January 1959
Greninger, A. B.
February 20, 1959
Primary view of Hanford Operations Office monthly status and progress report
Travis, J. E.
February 1, 1959
Primary view of Fuels Preparation Department monthly report, January 1959
unknown creator
February 23, 1959
Primary view of Ion Cyclotron Waves in Mirror Geometry
Furth, Harold P.
February 11, 1959
Primary view of Reconnaissance for Uranium in the Tocopilla area, Province of Antofagasta, Chile
Bowes, William A.; Knowles, Paul H.; C., Mario Serrano & S., Rudolfo Grüenwald
February 1959
Primary view of Response of a Low-Geometry Scintillation Counter to Fission and Other Products
LaRiviere, P. D.
February 4, 1959
Primary view of Yankee Atomic Electric Company Research and Development Program: Quarterly Progress Report: October 1, 1958 to December 31, 1958
Garbe, R. W. & Walchli, H. E.
February 16, 1959
Primary view of Report of the Fluid Fuel Reactors Task Force
unknown creator
February 1959
Primary view of Reactor Automatic Control and Load Swing Tests. Test Results DL-S-144 (T-554924). Section I
Baird, John B.
February 10, 1959
Primary view of Control Rod Positions for Criticality. Section I. Third Performance. Test Results DL-S-149 (T-550130)
Baird, John B.
February 12, 1959
Primary view of Determination of the Chemical Characteristics of the 1C Boiler. Test Results DL-S-209. Section III
Kline, H. A.
February 9, 1959
Primary view of Rod Drop Transient. Test Results DL-S-247 (T-641323). Section I
Price, F. C.
February 16, 1959
Primary view of Low-Energy [pi] Mesons in the Cosmic Radiation
Fotino, Mircea
February 2, 1959
Primary view of Processing of the Commission Blend of Colorado Front Range Uranium Ores
Nichols, I. L. (Ivan L.); Ross, J. R.; Tame, K. E. & Rosenbaum, J. B. (Joe B.)
February 1959
Primary view of Rod Drop Transient Test. Test Results DL-S-247 (T-641323). Section II
Heas, W. E.
February 12, 1959
Primary view of Processing of the Cotter Blend of Colorado Front Range Uranium Ores
Nichols, I. L. (Ivan L.); Tame, K. E. & Rosenbaum, J. B. (Joe B.)
February 1959
Primary view of The Chemistry and Nuclear Chemistry of the Heavy Elements : Progress Report No. 4
Cobble, J. W.
February 1959
Back to Top of Screen