Search Results

Primary view of Experimental investigation of flow fields at zero sideslip near swept- and unswept-wing-fuselage combinations at low speed
Alford, William J., Jr. & King, Thomas J., Jr.
January 18, 1957
Primary view of Localization of Cerium-144 in the Skeletal Tissues of Fetal Rats
Asling, C. W.; Johnston, M. E.; Durbin, P. W. & Hamilton, J. G.
October 18, 1957
Primary view of An Evaluation of the Calder Hall Type of Nuclear Power Plant
Banks, William F.; Schneider, G. A.; Morgan, William T. & Ash, E. B.
January 18, 1957
Primary view of Some Effects of Heat Transfer at Mach Number 2.0 at Stagnation Temperatures Between 2,310 and 3,500 Degrees R on a Magnesium Fin With Several Leading-Edge Modifications
Bland, William M., Jr. & Bressette, Walter E.
April 18, 1957
Primary view of Heat Transfer and Boundary-Layer Transition on a Highly Polished Hemisphere-Cone in Free Flight at Mach Numbers Up to 3.14 and Reynolds Numbers Up to 24 X 10(Exp 6)
Buglia, James J.
April 18, 1957
Primary view of Investigation of Drag and Static Longitudinal and Lateral Stability Characteristics of a Model of a 40.4 Degree Swept-Wing Airplane at Mach Numbers of 1.56 and 2.06
Carmel, Melvin M. & Turner, Kenneth L.
January 18, 1957
Primary view of Heat-Transfer and Pressure Distribution on Six Blunt Noses at a Mach Number of 2
Carter, Howard S. & Bressette, Walter E.
April 18, 1957
Primary view of Analysis of Limitations Imposed on One-Spool Ducted-Fan-Engine Designs by Compressors and Turbines at Flight Mach Numbers of 0, 0.6, and 0.8
Cavicchi, Richard H.
July 18, 1957
Primary view of Boundary-Layer-Transition and Heat-Transfer Measurements from Flight Tests of Blunt and Sharp 50 Degree Cones at Mach Numbers from 1.7 to 4.7
Chauvin, Leo T. & Speegle, Katherine C.
April 18, 1957
Primary view of Exploratory drilling in the Posey and Markey localities, Red Canyon area, San Juan County, Utah
Easton, William W. & Oertell, Eudene W.
March 18, 1957
Primary view of Continuous dissolution of uranium fuel elements in a tower dissolver
Evans, T. F.
June 18, 1957
Primary view of Investigation of a nonlinear control system
Flügge-Lotz, I.; Taylor, C. F. & Lindberg, H. E.
October 18, 1957
Primary view of Trip to Selas Corporation of America
Franco-Ferreira, E. A.
June 18, 1957
Primary view of Trip to Selas Corporation of America, May 23, 1957, to Discuss Investigations Into Methods of Tubesheet Brazing by Direct Heating
Franco-Ferreira, E. A.
June 18, 1957
Primary view of Measurements of Heat Transfer and Boundary-Layer Transition on an 8-Inch-Diameter Hemisphere-Cylinder in Free Flight for a Mach Number Range of 2.00 to 3.88
Garland, Benjamine J. & Chauvin, Leo T.
April 18, 1957
Primary view of Reference Design for an OMR-Powered 38,000-DWT Tanker
Gimera, R. J. & Stanbridge, R. E.
March 18, 1957
Primary view of PRELIMINARY RADIATION SURVEY OF THE SRE
Hale, J.P.
September 18, 1957
Primary view of EFFECT OF CORE CORROSION SAMPLE ASSEMBLY ON HRT CRITICAL CONCENTRATION
Haubenreich, P.N.
July 18, 1957
Primary view of Effect of Core Corrosion Sample Assembly on HRT Critical Concentration
Haubenreich, Paul N.
July 18, 1957
Primary view of RMF MEASUREMENTS ON MTR-IRRADIATED EUROPIUM OXIDE
Henscheid, J.W. & Fast, E.
January 18, 1957
Primary view of Pressure, flow, and temperature responses to a rapid plugging of a process tube
Hesson, G. M. & Thorne, W. L.
February 18, 1957
Primary view of A Method of Computing the Transient Temperature of Thick Walls From Arbitrary Variation of Adiabatic-Wall Temperature and Heat-Transfer Coefficient
Hill, P. R.
June 18, 1957
Primary view of Internal performance of several auxiliary air inlets immersed in a turbulent boundary layer at Mach numbers of 1.3, 1.5, and 2.0
Huff, Ronald G. & Anderson, Arthur R.
January 18, 1957
Primary view of Effect of burner design variables on performance of 16-inch diameter ram-jet combustor using gaseous-hydrogen fuel
Krull, H. George & Burley, Richard R.
January 18, 1957
Back to Top of Screen