100 Areas, January 1 through January 7, 1946
Description:
During this period the B Pile operated at its assigned power level of 25 MW below rated level, except for 10 hours on January 5. The operating level of the D Pile remained at 25 MW below rating. The rate gain in excess reactivity during equilibrium operation has been about 1.8 inhours/day. On January 1, the power level of the F Pile was dropped to 25 MW below rating from its previous rated level. Rod A was in a favorable position to make a determination of the reactivity coefficients at the tim…
more
Date:
January 11, 1946
Creator:
Jordan, W. E.
Item Type:
Refine your search to only
Report
Partner:
UNT Libraries Government Documents Department