Search Results

Primary view of Geography, Geology, and Water Resources of the National Reactor Testing Station, Idaho : Part 2, Geography and Geology
Nace, R. L.; Deutsch, Morris & Voegeli, P. T.
1956
Primary view of 1024 Channel Time-of-Flight Analyzer for MTR Fast Chopper - Operating Manual
Petree, F. L.
March 11, 1959
Primary view of Geography, Geology, and Water Resources of the National Reactor Testing Station, Idaho, Part 3: Hydrology and Water Resources
Nace, Raymond L.; Deutsch, Morris; Voegeli, Paul T.; Steward, J. W.; Walton, William Clarence; Fowler, K. H. et al.
1959
Primary view of Preliminary Hazards Summary Report for the ML-1 Nuclear Power Plant
Linenberger, G. A.
September 30, 1959
Primary view of In-Pile Loop Tests of GCRE Elements (I-IT and I-I'T)
Nakazato, S.; Williams, P. M. & Wilson, W. D.
July 2, 1959
Primary view of Geography, Geology, and Water Resources of the National Reactor Testing Station, Idaho: Part 1 Purpose, History, and Scope of Investigations
Nace, Raymond L.
1956
Primary view of Engineering Test Reactor : Engineering Design and Safeguards Report
Kaiser Engineers
July 1956
Primary view of Oak Ridge Site Report 30,000 KiloWatt Prototype Partially Enriched Uranium Gas Cooled, Graphite Moderated Nuclear Power Plant
Kaiser Engineers
March 1959
Primary view of A Neutron Absorption Alignment Chart
Nisle, Robert G.
July 30, 1957
Primary view of Determination of Burnout Limits of Polyphenyl Coolants : Summary Report
Core, T. C. & Sato, K.
February 14, 1958
Primary view of Heat Transfer in an Annulus with Asymmetric Heating
Lisin, Alexander Vladimir; Mackewicz, W. V. & Reynolds, William C., 1933-2004
February 1959
Primary view of Savannah River Project Site Report: 30,000 KW Prototype Partically Enriched Uranium Gas Cooled, Graphite Moderated Nuclear Power Plant for United States Atomic Energy Commission Idaho Operations Office
ACF Industries Incorporated. Nuclear Products - ERCO Division.
March 1959
Primary view of Comparison of Optimum Natural Uranium Nuclear Power Plant and Optimum Enriched Uranium Nuclear Power Plant
Kaiser Engineers
August 1958
Primary view of Appendix to Preliminary Design 30,000 KW Prototype Partially Enriched Uranium, Gas Cooled, Graphite Moderated Nuclear Power Plant (Prototype for an Optimum Plant) for United States Atomic Energy Commission Idaho Operations Office Contract No. AT(10-1)-925
Kaiser Engineers
March 1959
Primary view of Army Gas-Cooled Reactor Systems Program Monthly Progress Report: April 1959
Aerojet-General Corporation
May 25, 1959
Primary view of Army Gas-Cooled Reactor Systems Program Semiannual Progress Report: January 1 - June 30, 1959
Aerojet-General Corporation
July 31, 1959
Primary view of Preliminary Design 30,000 KW Prototype Partially Enriched Uranium, Gas Cooled, Graphite Moderated Nuclear Power Plant (Prototype of an Optimum Plant) for United States Atomic Energy Commission, Idaho Operations Office contract no. AT(10-1)-925
Kaiser Engineers
March 1959
Primary view of Feasibility Study, Optimum Natural Uranium, Gas Cooled, Graphite Moderated Nuclear Power Plant for United States Atomic Energy Commission, Idaho Operations Office
ACF Industries Incorporated. Nuclear Products - ERCO Division.
April 1, 1958
Primary view of Preliminary Design 55,000 KW Prototype Natural Uranium, Gas Cooled, Graphite Moderated Nuclear Power Plant (Prototype for an Optimum Plant) for United States Atomic Energy Commission, Idaho Operations Office
Kaiser Engineers
April 1, 1958
Primary view of Feasibility Study, 44,000 KW Prototype Partially Enriched Uranium, Gas Cooled, Graphite Moderated Nuclear Power Plant (Prototype for an Optium Power Plant) for United States Atomic Energy Commission, Idaho Operations Office
Kaiser Engineers
April 1, 1958
Primary view of Standard Practices for Design of MTR and ETR Safety Circuits
Jones, L. H.
September 15, 1957
Primary view of Supplement to Standard Practices for Design of MTR and ETR Safety Circuits
Jones, L. H.
November 21, 1958
Primary view of Distribution of Uranium at Low Acid : Low Uranium Concentrations into 4-1/2 Percent TBP-AMSCO
Andelin, Robert L.; Anderson, Edward L. & McVey, W. H.
August 23, 1956
Primary view of Startup Operation of a Production Facility for Separating Barium-140 from MTR Fuel
Legler, Billy Mason; Fairbourne, S. F.; Kelly, P. N. & Robinson, R. A.
September 1, 1957
Back to Top of Screen