This system will be undergoing maintenance April 18th between 9:00AM and 12:00PM CDT.

Search Results

open access

The Design of a Dynamic Corrosion and Chemical Control Test Loop and Preliminary Out-of-Pile Test Results

Description: From abstract: "This report describes the overall loop design and the means by which this design was developed. These include critical facility measurements, analog computer calculations, hydraulic and heat transfer computations, and the construction and operation of an out-of-pile mock-up loop to determine the dynamic characteristics of the loop."
Date: July 12, 1963
Creator: Zelezny, W. F.
Partner: UNT Libraries Government Documents Department
open access

Fundamentals in the Operation of Nuclear Test Reactors: Volume 2, Materials Testing Reactor Design and Operation

Description: Second volume of reports on the operation of nuclear test reactors. It includes six chapters: engineering description fo the materials testing reactor, reactor control components and instrumentation, reactor control circuitry, reactor operation, reactor shutdown and tank work, and supplemental facilities at the materials testing reactor.
Date: October 1963
Creator: Phillips Petroleum Company
Partner: UNT Libraries Government Documents Department
open access

Advanced Test Reactor: Final Shielding Design Report

Description: From abstract: "This report has been prepared as a design reference document describing the calculation methods and engineering results for shielding analysis work done during the design of the Advanced Test Reactor."
Date: December 1963
Creator: Howard, J. O. & Jacks, G. M.
Partner: UNT Libraries Government Documents Department
open access

ICPP Waste Calcining Facility : Safety Analysis Report

Description: Report documenting a study "made of the radiological hazards associated with operation of the ICPP Waste Calcination Facility" and contains "[d]etails of the safety analysis and extensive information on the process, equipment, and operation procedures" (p. iii). Each section has its own pagination.
Date: December 1, 1963
Creator: Lakey, L. T. & Bower, J. R.
Partner: UNT Libraries Government Documents Department
open access

Completion Report for Contracts AT(10-1)-1054, AT(10-1)-1122 : Drilling, Casing and Cementing Observation Wells at the National Reactor Testing Station, Idaho

Description: Report that "summarizes the costs, experience and results of contracts AT(10-1)-1054 and AT(10-1)-1122 for drilling, casing and cementing observation wells at the National Reactor Testing Station, Idaho" (p. [11]).
Date: May 1, 1963
Creator: Keys, W. S.
Partner: UNT Libraries Government Documents Department
Back to Top of Screen