Proposal for an Advanced Engineering Test Reactor : ETR II

Description: Report containing "the results of a study which was directed at providing additional experimental loop irradiation space for the AEC-DRD testing program. It was a premise that the experiments allocated to this reactor were those that could not be accommodated in the MTR, ETR or in existing commercial test reactors" (p. 5).
Date: March 17, 1960
Creator: deBoisblanc, D. R.
Partner: UNT Libraries Government Documents Department
open access

Appendix to Preliminary Design 55,000 KW Prototype Natural Uranium, Gas Cooled, Graphite Moderated Nuclear Power Plant (Prototype for an Optimum Plant) for United States Atomic Energy Commission, Idaho Operations Office

Description: Report containing documentation of projects undertaken by the multiple branches of the Health and Safety Division of the Idaho Operations Office at the Nuclear Reactor Testing Station (NRTS).
Date: March 1958
Creator: U.S. Atomic Energy Commission. Idaho Operations Office.
Partner: UNT Libraries Government Documents Department
open access

Preliminary Design 30,000 KW Prototype Partially Enriched Uranium, Gas Cooled, Graphite Moderated Nuclear Power Plant (Prototype of an Optimum Plant) for United States Atomic Energy Commission, Idaho Operations Office contract no. AT(10-1)-925

Description: Report containing the preliminary design for a nuclear reactor plant and its facilities. Includes a description of systems, safety procedures, costs, and a glossary.
Date: March 1959
Creator: Kaiser Engineers
Partner: UNT Libraries Government Documents Department
open access

Savannah River Project Site Report: 30,000 KW Prototype Partically Enriched Uranium Gas Cooled, Graphite Moderated Nuclear Power Plant for United States Atomic Energy Commission Idaho Operations Office

Description: Report describing a modified prototype of a nuclear reactor that uses partially uranium-enriched fuel and is cooled by helium. The construction site, site safety aspects, and design and construction costs are included.
Date: March 1959
Creator: ACF Industries Incorporated. Nuclear Products - ERCO Division.
Partner: UNT Libraries Government Documents Department
open access

Appendix to Preliminary Design 30,000 KW Prototype Partially Enriched Uranium, Gas Cooled, Graphite Moderated Nuclear Power Plant (Prototype for an Optimum Plant) for United States Atomic Energy Commission Idaho Operations Office Contract No. AT(10-1)-925

Description: Report containing outlines of operating procedures, costs, construction, safety analysis, studies, and design specifications of a 30,000 kilowatt prototype partially enriched uranium nuclear power plant.
Date: March 1959
Creator: Kaiser Engineers
Partner: UNT Libraries Government Documents Department
open access

Oak Ridge Site Report 30,000 KiloWatt Prototype Partially Enriched Uranium Gas Cooled, Graphite Moderated Nuclear Power Plant

Description: From introduction: "This report describes the selected site for a prototype nuclear plant, the reactor safety aspects for the site, the modified design of the plant, and estimate of the design and construction cost."
Date: March 1959
Creator: Kaiser Engineers
Partner: UNT Libraries Government Documents Department
open access

Gamma-Ray Spectrometry of Neutron-Deficient Isotopes: Annual Progress Report, March 1964

Description: From abstract: "The objective of this program is to produce a set of pulse-height spectra representing the response of a standard gamma-ray scintillation spectrometer to radiations emitted in the decay of neutron-deficient nuclides."
Date: March 27, 1964
Creator: Heath, R. L. & Cline, J. E.
Partner: UNT Libraries Government Documents Department
Back to Top of Screen