Search Results

Primary view of 1024 Channel Time-of-Flight Analyzer for MTR Fast Chopper - Operating Manual
Petree, F. L.
March 11, 1959
Primary view of Gamma-Ray Spectrometry of Neutron-Deficient Isotopes: Annual Progress Report, March 1964
Heath, R. L. & Cline, J. E.
March 27, 1964
Primary view of Results of ATR Sample Fuel Plate Irradiation Experiment
Phillips Petroleum Company
March 23, 1964
Primary view of Oak Ridge Site Report 30,000 KiloWatt Prototype Partially Enriched Uranium Gas Cooled, Graphite Moderated Nuclear Power Plant
Kaiser Engineers
March 1959
Primary view of Summary Report of Design Criteria for a Thermal Flux Liquid Metal Package Loop in the Advanced Test Reactor
Ebasco Services Incorporated
March 1963
Primary view of Savannah River Project Site Report: 30,000 KW Prototype Partically Enriched Uranium Gas Cooled, Graphite Moderated Nuclear Power Plant for United States Atomic Energy Commission Idaho Operations Office
ACF Industries Incorporated. Nuclear Products - ERCO Division.
March 1959
Primary view of Appendix to Preliminary Design 30,000 KW Prototype Partially Enriched Uranium, Gas Cooled, Graphite Moderated Nuclear Power Plant (Prototype for an Optimum Plant) for United States Atomic Energy Commission Idaho Operations Office Contract No. AT(10-1)-925
Kaiser Engineers
March 1959
Primary view of Annual Progress Report on Fuel Element Development for Fiscal Year 1961
Gibson, G. W. & Shupe, O. K.
March 9, 1962
Primary view of Preliminary Design 30,000 KW Prototype Partially Enriched Uranium, Gas Cooled, Graphite Moderated Nuclear Power Plant (Prototype of an Optimum Plant) for United States Atomic Energy Commission, Idaho Operations Office contract no. AT(10-1)-925
Kaiser Engineers
March 1959
Primary view of Proposal for an Advanced Engineering Test Reactor : ETR II
deBoisblanc, D. R.
March 17, 1960
Primary view of Appendix to Preliminary Design 55,000 KW Prototype Natural Uranium, Gas Cooled, Graphite Moderated Nuclear Power Plant (Prototype for an Optimum Plant) for United States Atomic Energy Commission, Idaho Operations Office
U.S. Atomic Energy Commission. Idaho Operations Office.
March 1958
Back to Top of Screen