Search Results

Primary view of 1024 Channel Time-of-Flight Analyzer for MTR Fast Chopper - Operating Manual
Petree, F. L.
March 11, 1959
Primary view of Rice Lake Quadrangle, Wisconsin
Routledge, R. E.; Parrish, I. S. & Leigh, O. E.
January 1981
Primary view of Geography, Geology, and Water Resources of the National Reactor Testing Station, Idaho, Part 3: Hydrology and Water Resources
Nace, Raymond L.; Deutsch, Morris; Voegeli, Paul T.; Steward, J. W.; Walton, William Clarence; Fowler, K. H. et al.
1959
Primary view of Design for a Fast Flux Liquid Metal Loop in the Advanced Test Reactor
Babcock & Wilcox Company. Atomic Energy Division.
July 1962
Primary view of Geography, Geology, and Water Resources of the National Reactor Testing Station, Idaho : Part 2, Geography and Geology
Nace, R. L.; Deutsch, Morris & Voegeli, P. T.
1956
Primary view of Materials Testing Reactor-Engineering Test Reactor Technical Branches Quarterly Report: October 1 - December 31, 1963
Phillips Petroleum Company
May 1964
Primary view of Final Summary Report of the Gas-Cooled Reactor Experiment-1
Chesworth, R. H.
October 1963
Primary view of National Uranium Resource Evaluation, Athens Quadrangle, Georgia and South Carolina, Appendix D: Petrologic Reports, Petrographic Descriptions, Heavy Mineral Analyses, X-Ray Mineral Identification, Uranium Mineral Analyses
unknown creator
unknown creation date
Primary view of National Uranium Resource Evaluation, Athens Quadrangle, Georgia and South Carolina, Appendix C: Uranium-Occurrence Reports
unknown creator
1980
Primary view of Preliminary Hazards Summary Report for the ML-1 Nuclear Power Plant
Linenberger, G. A.
September 30, 1959
Primary view of In-Pile Loop Tests of GCRE Elements (I-IT and I-I'T)
Nakazato, S.; Williams, P. M. & Wilson, W. D.
July 2, 1959
Primary view of The ML-1 Design Report
Linenberger, G. A.
May 16, 1960
Primary view of In-Pile Tests of GCRE-IB Prototype Fuel Elements: Interim Report, 1958-1959
Watanabe, H. T.; Janne, J. E. & Wilson, W. D.
December 1960
Primary view of Transportability Studies : ML-1 Nuclear Power Plant
Blakley, J. W.; Alcorn, J. S.; Del Valle, L. G.; Healy, P. W.; Moran, D. H. & Scott, W. S.
April 1960
Primary view of High-Temperature Irradiation of UOâ‚‚-BeO Bodies
Titus, G. W. & Saling, J. H.
January 1963
Primary view of In-Pile Test of Prototype ML-1 Fuel Elements
Brunhouse, J. S.; Burgess, A. B.; Geering, G. T.; Nakazato, S. & Titus, G. W.
June 1964
Primary view of Full Power and Limited Endurance Test of the ML-1 Nuclear Power Plant (ANSOP 16625A)
Aerojet-General Corporation
September 1964
Primary view of Gamma-Ray Spectrometry of Neutron-Deficient Isotopes: Annual Progress Report, March 1964
Heath, R. L. & Cline, J. E.
March 27, 1964
Primary view of Gamma-Ray Spectrometry of Neutron-Deficient Isotopes: Annual Progress Report, November 1964
Heath, R. L. & Cline, J. E.
November 1964
Primary view of STEP Project Quarterly Technical Report: January-June 1964
U.S. Atomic Energy Commission. Idaho Operations Office.
June 1965
Primary view of Hydrology of Subsurface Waste Disposal, National Reactor Testing Station, Idaho : Annual Progress Report, 1963
Morris, D. A.
May 1964
Primary view of Television System Study for Accident Recovery : Phase I
Talpis, N. A. & Burge, D. L.
April 1966
Primary view of EOCR Control Rod and Driver Fuel Hydraulic Tests
Harrison, L. J.
October 19, 1962
Primary view of The Design of a Dynamic Corrosion and Chemical Control Test Loop and Preliminary Out-of-Pile Test Results
Zelezny, W. F.
July 12, 1963
Back to Top of Screen