Search Results

Primary view of 20,000 KW Nuclear Power Plant Study for United States Atomic Energy Commission
Gilbert Associates, Inc.
July 7, 1957
Primary view of Organic Cooled Reactor Study [Part 4]: 75 Mw Power Plant Conceptual Design
Bechtel Corporation
July 1959
Primary view of Polonium
Moyer, Harvey Vernon; Gnagey, Lloyd B. & Rogers, Adrian J.
July 1956
Primary view of Advanced Pressurized Water Reactor Study [Part 1]: Phase 1 Report
U.S. Atomic Energy Commission. Division of Reactor Development.
July 1959
Primary view of Advanced Pressurized Water Reactor Study [Part 3]: 235 Mw Coal-fired Generating Plant
U.S. Atomic Energy Commission. Division of Reactor Development.
July 1959
Primary view of Boiling Water Reactor Study [Part 1]: 306 Mw Power Reactor Conceptual Design
Ebasco Services Incorporated
July 1959
Primary view of Boiling Water Reactor Study [Part 2]: Separate Studies
Ebasco Services Incorporated
July 1959
Primary view of Boiling Water Reactor Study [Part 3]: 306 Mw Coal-Fired Installation
Ebasco Services Incorporated
July 1959
Primary view of Organic Cooled Reactor Study [Part 3]: Reactor Concept Evaluation
Bechtel Corporation
July 1959
Primary view of Lawrence Radiation Laboratory Medical and Health Physics Quarterly Report: April - June 1954
Lawrence Radiation Laboratory
July 29, 1954
Primary view of In-Pile Loop Tests of GCRE Elements (I-IT and I-I'T)
Nakazato, S.; Williams, P. M. & Wilson, W. D.
July 2, 1959
Primary view of Attenuation in Water of Radiation from the Bulk Shielding Reactor: Measurements of the Gamma-Ray Dose Rate, Fast Neutron Dose Rate, and Thermal-Neutron Flux
Oak Ridge National Laboratory
July 8, 1958
Primary view of Liquid Metal Reactor Experiment Preliminary Hazards Evaluation, July 1957
Babcock & Wilcox Company
July 1957
Primary view of Joint Design for Making Root Pass Welds without Filler Material
Lemon, L. C. & Smith, W. R.
July 9, 1956
Primary view of Fabrication of the PRTR Zircaloy-2 High Pressure Process Tubes
Knecht, R. L.
July 31, 1959
Primary view of Engineering Test Reactor : Engineering Design and Safeguards Report
Kaiser Engineers
July 1956
Primary view of Army Gas-Cooled Reactor Systems Program Semiannual Progress Report: January 1 - June 30, 1959
Aerojet-General Corporation
July 31, 1959
Primary view of A Neutron Absorption Alignment Chart
Nisle, Robert G.
July 30, 1957
Primary view of Scintillation Spectrometry : Gamma-Ray Spectrum Catalogue
Heath, R. L.
July 1, 1957
Back to Top of Screen