Search Results

Primary view of Metallurgy Division Annual Progress Report, September 1, 1959
Oak Ridge National Laboratory. Metallurgy Division.
December 16, 1959
Primary view of Experimental Organic Cooled Reactor : Conceptual Design
Huffman, John R.; Nyer, W. E. & Rainwater, J. H.
December 1, 1959
Primary view of Nuclear Superheat Meeting: September 1959
unknown creator
November 3, 1959
Primary view of Instrumentation and Controls Division Annual Progress Report, July 1, 1959
Oak Ridge National Laboratory. Instrumentation and Controls Division.
November 2, 1959
Primary view of Distribution of the Actinide Elements in the Molten System: KCI-AICI3-AI
Moore, R. H. & Lyon, W. L.
October 20, 1959
Primary view of A Brief Study of Boiling Water Reactors in the 5 to 40 eMW Range
unknown creator
October 10, 1959
Primary view of Preliminary Hazards Summary Report for the ML-1 Nuclear Power Plant
Linenberger, G. A.
September 30, 1959
Primary view of Homogeneous Reactor Project Quarterly Progress Report: February-April 1959
Oak Ridge National Laboratory
August 8, 1959
Primary view of Army Gas-Cooled Reactor Systems Program Semiannual Progress Report: January 1 - June 30, 1959
Aerojet-General Corporation
July 31, 1959
Primary view of Fabrication of the PRTR Zircaloy-2 High Pressure Process Tubes
Knecht, R. L.
July 31, 1959
Primary view of In-Pile Loop Tests of GCRE Elements (I-IT and I-I'T)
Nakazato, S.; Williams, P. M. & Wilson, W. D.
July 2, 1959
Primary view of Advanced Pressurized Water Reactor Study [Part 1]: Phase 1 Report
U.S. Atomic Energy Commission. Division of Reactor Development.
July 1959
Primary view of Advanced Pressurized Water Reactor Study [Part 3]: 235 Mw Coal-fired Generating Plant
U.S. Atomic Energy Commission. Division of Reactor Development.
July 1959
Primary view of Boiling Water Reactor Study [Part 1]: 306 Mw Power Reactor Conceptual Design
Ebasco Services Incorporated
July 1959
Primary view of Boiling Water Reactor Study [Part 2]: Separate Studies
Ebasco Services Incorporated
July 1959
Primary view of Boiling Water Reactor Study [Part 3]: 306 Mw Coal-Fired Installation
Ebasco Services Incorporated
July 1959
Primary view of Organic Cooled Reactor Study [Part 3]: Reactor Concept Evaluation
Bechtel Corporation
July 1959
Primary view of Organic Cooled Reactor Study [Part 4]: 75 Mw Power Plant Conceptual Design
Bechtel Corporation
July 1959
Primary view of Final Report on Design Tests PR-50 and PR-51: Reactor Piping Seal Testing and Reactor Piping Structural Integrity
Jackson, P. M.
June 26, 1959
Primary view of Molten-Salt Reactor Program Quarterly Progress Report: April 1959
Oak Ridge National Laboratory
June 26, 1959
Primary view of Oak Ridge National Laboratory Instrumentation and Controls Division Annual Progress Report: 1958
Oak Ridge National Laboratory. Instrumentation and Controls Division.
June 24, 1959
Primary view of Physics Division Annual Progress Report, March 10, 1959
Oak Ridge National Laboratory. Physics Division.
June 10, 1959
Primary view of Argonne High-Flux Research Reactor: AHFR Conceptual Design Study
Link, L. E.; Armstrong, R. H.; Cameron, T. C.; Heineman, J. B.; Kelber, C. N.; Kier, P. H. et al.
June 1959
Primary view of Army Gas-Cooled Reactor Systems Program Monthly Progress Report: April 1959
Aerojet-General Corporation
May 25, 1959
Back to Top of Screen