Search Results

open access

Lawrence Radiation Laboratory Medical and Health Physics Quarterly Report: April - June 1954

Description: The following quarterly report covers the period between April, May and June of 1954. The reports presented in this document discusses subjects of medical health and physics such as: biological studies of radiation effects, the metabolic properties of various tracer materials, radiation chemistry, health chemistry, and health physics.
Date: July 29, 1954
Creator: Lawrence Radiation Laboratory
Partner: UNT Libraries Government Documents Department
open access

Polonium

Description: From foreword: This is a report on the efforts of Monsanto Chemical Co. to solve some of the chemical problems involved in the atomic energy program.
Date: July 1956
Creator: Moyer, Harvey Vernon; Gnagey, Lloyd B. & Rogers, Adrian J.
Partner: UNT Libraries Government Documents Department
open access

Advanced Pressurized Water Reactor Study [Part 1]: Phase 1 Report

Description: From preface: This report covers Phase I of the authorized work, consisting of determination of the specific reactor concept and size for the most economic reactor, preparation of a reference design of the most promising concept and estimated capital and generating costs, evaluation of the variations in cost as a function of unit size, and evaluation of the reductions in ultimate costs for a power station having multiple units of the same type.
Date: July 1959
Creator: U.S. Atomic Energy Commission. Division of Reactor Development.
Partner: UNT Libraries Government Documents Department
open access

Advanced Pressurized Water Reactor Study [Part 3]: 235 Mw Coal-fired Generating Plant

Description: "This study is one of four initiated in 1958 by the Division of Reactor Development, U.S. Atomic Energy Commission, to assess the feasibility of power generation through the use of certain types of nuclear reactors. These studies are available from the Office of Technical Services, U.S. Department of Commerce, Washington 25, D.C."
Date: July 1959
Creator: U.S. Atomic Energy Commission. Division of Reactor Development.
Partner: UNT Libraries Government Documents Department
open access

Boiling Water Reactor Study [Part 1]: 306 Mw Power Reactor Conceptual Design

Description: From introduction: In general, the objective of this study is to provide for the development of the conceptual design criteria for the most promising type of boiling water reactor and associated complete electrical generating plant consistent with a schedule calling for start of construction in July 1960.
Date: July 1959
Creator: Ebasco Services Incorporated
Partner: UNT Libraries Government Documents Department
open access

Boiling Water Reactor Study [Part 2]: Separate Studies

Description: From introduction: This section presents the principal results of the optimization study done to establish the economic basis for selection of the core and fuel design.
Date: July 1959
Creator: Ebasco Services Incorporated
Partner: UNT Libraries Government Documents Department
open access

Boiling Water Reactor Study [Part 3]: 306 Mw Coal-Fired Installation

Description: From introduction: The objectives of this study are to determine the estimated capital and energy costs of this typical conventional coal-fired installation, consistent with a schedule calling for completion of construction April 1964.
Date: July 1959
Creator: Ebasco Services Incorporated
Partner: UNT Libraries Government Documents Department
open access

Organic Cooled Reactor Study [Part 3]: Reactor Concept Evaluation

Description: From summary and conclusions: The purpose of this volume is to present the results of design studies to select the optimum-sized electric power station utilizing an organic cooled nuclear reactor and to evaluate and optimize the various reactor concepts, with special attention to selection of the moderator, consistent with the basic design criteria established by the AEC.
Date: July 1959
Creator: Bechtel Corporation
Partner: UNT Libraries Government Documents Department
open access

20,000 KW Nuclear Power Plant Study for United States Atomic Energy Commission

Description: Introduction: In September of 156, Gilbert Associates, Inc., entered into a contract with the United States of America, acting through the United States Atomic Energy Commission, for the study and preliminary design of a nuclear power plant being considered for integration into a central station power system at an overseas site.
Date: July 7, 1957
Creator: Gilbert Associates, Inc.
Partner: UNT Libraries Government Documents Department
open access

In-Pile Loop Tests of GCRE Elements (I-IT and I-I'T)

Description: Report documenting two in-pile loop experiments conducted at the Battelle Research Reactor-Gas Cooled Reactor (BRR-GCR). These experiments test heat transfer calculations and the behavior of the fuel element under severe thermal-cycling conditions.
Date: July 2, 1959
Creator: Nakazato, S.; Williams, P. M. & Wilson, W. D.
Partner: UNT Libraries Government Documents Department
open access

Fabrication of the PRTR Zircaloy-2 High Pressure Process Tubes

Description: Development of a fabrication process and the manufacture of 95 PRTR process tubes demonstrates that the commercial fabrication of high quality Zircaloy-2 pressure tubing is feasible.
Date: July 31, 1959
Creator: Knecht, R. L.
Partner: UNT Libraries Government Documents Department
open access

A Neutron Absorption Alignment Chart

Description: From introduction: "Neutron absorption alignment chart for the measurement of neutron flux density."
Date: July 30, 1957
Creator: Nisle, Robert G.
Partner: UNT Libraries Government Documents Department
open access

Scintillation Spectrometry : Gamma-Ray Spectrum Catalogue

Description: Report presenting a collection of gamma spectra containing samples of the response of NaI(TI) scintillation detectors to a large number of the more frequently encountered radioactive nuclides.
Date: July 1, 1957
Creator: Heath, R. L.
Partner: UNT Libraries Government Documents Department
Back to Top of Screen