Search Results

open access

Fabrication of the PRTR Zircaloy-2 High Pressure Process Tubes

Description: Development of a fabrication process and the manufacture of 95 PRTR process tubes demonstrates that the commercial fabrication of high quality Zircaloy-2 pressure tubing is feasible.
Date: July 31, 1959
Creator: Knecht, R. L.
Partner: UNT Libraries Government Documents Department
open access

Preliminary Hazards Summary Report for the ML-1 Nuclear Power Plant

Description: From abstract: "Neutronic characteristics, the control and instrumentation system, equipment description and plant safety considerations of the ML-1 (mobile, low power) nuclear power plant. The site is described with reference to geology, climate, and population density."
Date: September 30, 1959
Creator: Linenberger, G. A.
Partner: UNT Libraries Government Documents Department
open access

In-Pile Loop Tests of GCRE Elements (I-IT and I-I'T)

Description: Report documenting two in-pile loop experiments conducted at the Battelle Research Reactor-Gas Cooled Reactor (BRR-GCR). These experiments test heat transfer calculations and the behavior of the fuel element under severe thermal-cycling conditions.
Date: July 2, 1959
Creator: Nakazato, S.; Williams, P. M. & Wilson, W. D.
Partner: UNT Libraries Government Documents Department
open access

An Automatic Analyzing Monitor for Reactor Effluent Cooling Water

Description: From objective: "The objective of this work was to design, develop, assemble, and test and automatic analyzing monitor for recording the prominent isotopes in reactor effluent cooling water."
Date: May 1, 1959
Creator: Rieck, H. G.; Ratcliffe, C. A. & Schwendiman, L. C.
Partner: UNT Libraries Government Documents Department
Back to Top of Screen