Search Results

Primary view of Irradiation of an Aluminum Alloy-Clad, Aluminum-Uranium Alloy-Fueled Plate
Gavin, A. P. & Crothers, C. C.
July 1960
Primary view of Performance Characteristics of a Liquid Metal MHD Generator
Petrick, Michael & Lee, Kung-You
July 1964
Primary view of Cost Study of a 100-Mw(e) Direct-Cycle Boiling Water Reactor Plant
Bullinger, C. F. & Harrer, J. M.
July 1960
Primary view of A Neutron Absorption Alignment Chart
Nisle, Robert G.
July 30, 1957
Primary view of Army Gas-Cooled Reactor Systems Program Semiannual Progress Report: January 1 - June 30, 1959
Aerojet-General Corporation
July 31, 1959
Primary view of Engineering Test Reactor : Engineering Design and Safeguards Report
Kaiser Engineers
July 1956
Primary view of Army Gas-Cooled Reactor Systems Program Semiannual Progress Report: January 1 - June 30, 1960
Aerojet-General Corporation
July 31, 1960
Primary view of Scintillation Spectrometry : Gamma-Ray Spectrum Catalogue
Heath, R. L.
July 1, 1957
Primary view of Health and Safety Laboratory Fallout Program Quarterly Summary Report: March 1, 1963 - June 1, 1963
Hardy, Edward P., Jr.; Rivera, Joseph & Collins, William R., Jr.
July 1, 1963
Primary view of Health and Safety Laboratory Fallout Program Quarterly Summary Report: March 1, 1964 - June 1, 1964
Hardy, Edward P., Jr.; Rivera, Joseph & Collins, William R., Jr.
July 1, 1964
Primary view of Health and Safety Laboratory Fallout Program Quarterly Summary Report: March 1, 1962 - June 1, 1962
Hardy, Edward P., Jr.; Rivera, Joseph & Frankel, Robert
July 1, 1962
Primary view of Health and Safety Laboratory Fallout Program Quarterly Summary Report: March 1, 1961 - June 1, 1961
Hardy, Edward P., Jr.; Rivera, Joseph & Frankel, Robert
July 1, 1961
Primary view of Health and Safety Laboratory Fallout Program Quarterly Summary Report: March 1, 1960 - June 1, 1960
Hardy, Edward P., Jr.; Klein, Stanley & Rivera, Joseph
July 1, 1960
Primary view of Puerto Rico Energy Center Study: Site Selection Supplement
Burns and Roe
July 1970
Primary view of Organic Cooled Reactor Study [Part 4]: 75 Mw Power Plant Conceptual Design
Bechtel Corporation
July 1959
Primary view of Polonium
Moyer, Harvey Vernon; Gnagey, Lloyd B. & Rogers, Adrian J.
July 1956
Primary view of Advanced Pressurized Water Reactor Study [Part 1]: Phase 1 Report
U.S. Atomic Energy Commission. Division of Reactor Development.
July 1959
Primary view of Advanced Pressurized Water Reactor Study [Part 3]: 235 Mw Coal-fired Generating Plant
U.S. Atomic Energy Commission. Division of Reactor Development.
July 1959
Primary view of Boiling Water Reactor Study [Part 1]: 306 Mw Power Reactor Conceptual Design
Ebasco Services Incorporated
July 1959
Primary view of Boiling Water Reactor Study [Part 2]: Separate Studies
Ebasco Services Incorporated
July 1959
Primary view of Boiling Water Reactor Study [Part 3]: 306 Mw Coal-Fired Installation
Ebasco Services Incorporated
July 1959
Primary view of Organic Cooled Reactor Study [Part 3]: Reactor Concept Evaluation
Bechtel Corporation
July 1959
Primary view of 20,000 KW Nuclear Power Plant Study for United States Atomic Energy Commission
Gilbert Associates, Inc.
July 7, 1957
Primary view of Final Report : Large Reactor Study for Sea Water Distillation
Bechtel Corporation
July 1963
Back to Top of Screen