This system will be undergoing maintenance December 14th from 8:00AM to 1:00PM CST.

Search Results

open access

Pulse Amplifier Manual

Description: Manual for the use and repair of repair pulse amplifiers. This covers general testing routines, specific tests, and a bibliography of related materials.
Date: 1962
Creator: Fairstein, E.
Partner: UNT Libraries Government Documents Department
open access

Nuclear Measurements for Type 3 Replacement Cores for SM-1, SM-1A and PM-2A CE 3

Description: Abstract: This technical report contains the description and results of an experimental program to evaluate the effect of utilizing Type 3 (SM-2) replacement cores in existing Army field plants SM-1, SM-1A and PM-2A. This program, conducted at the Alco Products Critical Facility, employed SM-2 mockup fuel elements similar in composition to Type 3 fuel elements to determine start-up characteristics of Type 3 cores in SM-1, SM-1A and PM-2A core configurations. measurements include comprehensive … more
Date: January 11, 1962
Creator: Raby, T. M.; Walthousen, L. D.; Kemp, S. N.; McCool, W. J.; Sontheimer, K. C. & Robinson, R. A.
Partner: UNT Libraries Government Documents Department
open access

Investigation of 17-4 PH Steel Components Used in SM-1, SM-1A, PM-2A Reactor Plants

Description: Abstract: This technical report covers the investigation of 17-4 PH steel components used in the SM-1, SM-1A and PM-2A nuclear power plants, which consist of control rod drive racks, pinions, seal shafts and associated parts. Evidence supporting the continued use of 17-4 PH steel in these applications is presented. Alco's current procurement and processing specifications for 17-4 PH steel are included. The evidence presented is in the form of stress calculations, test and environmental data and… more
Date: January 23, 1962
Creator: Haraway, E. S. & Saccocio, R. M.
Partner: UNT Libraries Government Documents Department
open access

Hazards Report for Step Transient Loading Tests on the SM-1 : Task XII

Description: Abstract: This technical report evaluates hazards involved with SM- 1 plant response and system performance tests (Task XII), to determine the response of the SM-1 plant to step electrical and steam load changes. The report describes the changes in plant equipment and operating procedures for this task and evaluates these changes for possible additional hazards to those described in APAE No. 2, Revision 1, "Hazards Summary Report for the Army Package Power Reactor SM-1."
Date: February 1, 1962
Creator: Pomeroy, D. L.
Partner: UNT Libraries Government Documents Department
open access

Summary Report of Physics Measurements on SM-1 Core I

Description: Abstract: This technical report summarizes all core physics experiments performed on SM-1 Core I and SM-2 Rearranged and Spiked Core I throughout core life. These measurements were obtained on site during the 16.4 MWYR lifetime of SM-1 Core I and 1.6 MWYR lifetime of SM-1 Rearranged and Spiked Core I. SM-1 Core I was the first stainless steel - UO2 dispersion core to burn out in the Army Nuclear Power Program. Experimental techniques are described and a complete history of fuel movements in th… more
Date: February 6, 1962
Creator: Weiss, S. H.
Partner: UNT Libraries Government Documents Department
open access

Conceptual Design for 75 MWe Mixed Spectrum Superheating Reactor Power Plant

Description: "This report presents the conceptual design of a 75 MWe prototype Mixed Spectrum Superheater power plant. The scope of the work has emphasized primarily the design, performance, and cost information on the nuclear portion of the plant. The research and development programs required to insure plant feasibility are also present."--Intro.
Date: February 25, 1962
Creator: U.S. Atomic Energy Commission
Partner: UNT Libraries Government Documents Department
open access

BWR Reference Design for PL-3

Description: Abstract: The natural circulation, direct cycle, boiling water reactor reference design presented in this technical report is the alternate to the preferred preliminary design developed under Phase I of the PL-3 contract. The report presents plant design criteria, summary of plant selection, plant description, reactor and primary system description, thermal and hydraulic analysis, nuclear analysis, control and instrumentation description, shielding description, auxiliary systems, power plant eq… more
Date: February 28, 1962
Creator: Humphries, G. E.
Partner: UNT Libraries Government Documents Department
open access

Hazards Report for SM-1 Core Temperature and Flow Instrumentation (Task XIV) Covering Special Test Procedures.

Description: Abstract: Test procedures for special tests involving in-core SM-1 temperature and flow instrumentation are described (Task XIV Package Tests). These tests involve in-core steady state flow and temperature measurements, loss of flow transients, load transients, reduced primary system pressure operations and reduced element flow. The thermal and hydraulic conditions prevailing in these tests, including steady state and transient burnout rations, are developed. The effects of reduced system pres… more
Date: February 28, 1962
Creator: Bradley, P. L. & Coombe, J. R.
Partner: UNT Libraries Government Documents Department
open access

PWR Preliminary Design for PL-3

Description: Abstract: The pressurized water reactor preliminary design presented in this volume is the preferred design developed under Phase I of the PL-3 contact. This technical report presents plant design criteria, summary of plant selection, plant description, reactor and primary system description, thermal and hydraulic analysis, nuclear analysis, control and instrumentation description, shielding description, auxiliary systems, power plant equipment, waste disposal, buildings and tunnels, services, … more
Date: February 28, 1962
Creator: Humphries, G. E.
Partner: UNT Libraries Government Documents Department
open access

PL-3 Phase I Task 3 Research and Development Report

Description: Abstract: This technical report summarizes the results of research and development tasks performed during Phase I of this contract and presents recommendations for future development work. Work is reported in the areas of plant assembly and relocation, housings and footings, waste heat dissipation, instrumentation, refueling systems, waste disposal, shielding, core nuclear thermal and hydraulic studies, gaseous waste processing (BWR), and critical experiments on a 5 x 5 array of Type 3 fuel ele… more
Date: March 12, 1962
Creator: Humphries, G. E.
Partner: UNT Libraries Government Documents Department
Back to Top of Screen