Search Results

Primary view of Fast Neutron Data
Feshbach, H.
January 25, 1950
Primary view of Floating-Decimal Matrix Inversion
Trantham, F. M., Jr.
April 1955
Primary view of Final Design Report KAPL-120 High Pressure Recirculating Water Loop
Wade, G. E. & Berberet, J. A.
January 15, 1956
Primary view of Engineering Test Reactor : Engineering Design and Safeguards Report
Bush, P. D.; Sybert, W. M.; Levy, S. & Rieger, G. F.
July 1956
Primary view of Joint Design for Making Root Pass Welds without Filler Material
Lemon, L. C. & Smith, W. R.
July 9, 1956
Primary view of Uranium Concentration Meter
Arnett, Orville
September 24, 1956
Primary view of Extraction of Thorium Nitrate from Nitric Acid by TBP - "Ultrasene"
Siddall, Thomas H., III
October 1956
Primary view of The Purex process : a Solvent Extraction Reprocessing Method for Irradiated Uranium
Irish, E. R. & Reas, W. H.
April 8, 1957
Primary view of A Martensitic Reaction for Uranium
Bement, A. L. & Wallace, W. P.
June 25, 1957
Primary view of A Neutron Absorption Alignment Chart
Nisle, Robert G.
July 30, 1957
Primary view of Plating Thickness Tester
Fitch, C. E., Jr.
November 15, 1957
Primary view of Factors Affecting Fluidization of Uranium Trioxide Powders
Johnson, B. M.
March 1, 1958
Primary view of Portable Mercury Vapor Detector
McMurray, C. S. & Redmond, J. W.
March 14, 1958
Primary view of Design and Installation of a High Precision Temperature and Intimate Contact Monitor for Experimental Vacuum Chucks
Morrow, G. W.
May 15, 1958
Primary view of An Alpha, Beta, Gamma Hand and Shoe Counter - Model 2
Spear, W. G.
June 2, 1958
Primary view of Accidental Radiation Excursion at the Y-12 Plant, June 16, 1958: Final Report
Patton, F. S.; Bailey, J. C.; Callihan, A. D.; Googin, J. M.; Jasny, G. R.; McAlduff, H. J. et al.
September 12, 1958
Primary view of The Effect of Temperature on the Neutron Attenuation of Magnetite Concrete
Wood, D. E.
December 11, 1958
Primary view of Trans-Plutonium Isotope Buildup by Neutron Irradiation of Plutonium
Brauer, F. P. & Burley, Helen H.
December 15, 1958
Primary view of An Automatic Analyzing Monitor for Reactor Effluent Cooling Water
Rieck, H. G.; Ratcliffe, C. A. & Schwendiman, L. C.
May 1, 1959
Primary view of Final Report on Design Tests PR-50 and PR-51: Reactor Piping Seal Testing and Reactor Piping Structural Integrity
Jackson, P. M.
June 26, 1959
Primary view of In-Pile Loop Tests of GCRE Elements (I-IT and I-I'T)
Nakazato, S.; Williams, P. M. & Wilson, W. D.
July 2, 1959
Primary view of Fabrication of the PRTR Zircaloy-2 High Pressure Process Tubes
Knecht, R. L.
July 31, 1959
Primary view of Preliminary Hazards Summary Report for the ML-1 Nuclear Power Plant
Linenberger, G. A.
September 30, 1959
Primary view of Distribution of the Actinide Elements in the Molten System: KCI-AICI3-AI
Moore, R. H. & Lyon, W. L.
October 20, 1959
Back to Top of Screen