Search Results

open access

Accidental Radiation Excursion at the Y-12 Plant, June 16, 1958: Final Report

Description: This report describes the circumstances leading to the accident, attempts to reconstruct the nuclear reactivity conditions, and reviews the dosimetric means and results which were used to help determine the exposure of affected employees.
Date: September 12, 1958
Creator: Patton, F. S.; Bailey, J. C.; Callihan, A. D.; Googin, J. M.; Jasny, G. R.; McAlduff, H. J. et al.
Partner: UNT Libraries Government Documents Department
open access

The Cold Pressing of Sinterable UO₂

Description: The intent of this work was to explore more fully the pressing of sinterable UO2 powders into cylindrical compacts in the hope that a more precise prediction of green density in terms of powder properties, pressure, and geometry could be evolved.
Date: March 27, 1961
Creator: Levey, R. P., Jr.
Partner: UNT Libraries Government Documents Department
open access

Effects of Major Parameters on Cycle Efficiency and Cost for a Gas-Cooled Reactor Turbine Power Plant

Description: Cycle study performed on a closed loop Brayton cycle incorporating a gas-cooled nuclear reactor, regeneration, and compressor intercooling. The purpose of the study was to determine the effect of various cycle parameters on efficiency and cost.
Date: October 5, 1962
Creator: Miskell, R. V.
Partner: UNT Libraries Government Documents Department
open access

The Influence of Design and Production Parameters on Fabrication Costs of Nuclear Reactor Fuel Elements

Description: The objectives for this study were to determine fuel fabrication and assembly costs in a large nuclear power industry for several reactors, fuel rod sizes, and fuel materials.
Date: November 1, 1961
Creator: Stein, P. E.; Ayers, A. C.; Braatz, R. J.; Bradford, C. M.; Holt, V. D. & Mattie, G. P.
Partner: UNT Libraries Government Documents Department
open access

Portable Mercury Vapor Detector

Description: From abstract: "This report describes a functional mercury vapor detector which is a portable, self-contained, survey instrument, and had a minimum range from zero to two-tenths milligram of mercury per cubic meter of air."
Date: March 14, 1958
Creator: McMurray, C. S. & Redmond, J. W.
Partner: UNT Libraries Government Documents Department
open access

Production of Zirconium at Y-12

Description: Abstract: "A general description is given of the permanent zirconium plant at Y-12. Equipment is described and materials of construction are listed. Photographs illustrating principal equipment and reduced construction drawings are also presented. Operating conditions and costs information are listed."
Date: November 17, 1955
Creator: Ramsey, J. W. & Whitson, W. K., Jr.
Partner: UNT Libraries Government Documents Department
open access

Separation of Zirconium & Hafnium : Proposal for Construction & Operation of Zirconium Production Plant

Description: Abstract: A re-evaluation of the cost of producing essentially hafnium free zirconium as zirconium oxide at a rate of 150,000-200,000 pounds zirconium per year by solvent extraction of the metal thiocyanates in a permanent plant has been made. Using part of the present temporary facilities, the cost, with five year amortization of the plant, will be $3.15 per pound zirconium. A by-product of the mixed oxides of hafnium and zirconium, having at least fifty percent hafnium and perhaps as high as … more
Date: November 17, 1955
Creator: Googin, J. M. & Strasser, G. A.
Partner: UNT Libraries Government Documents Department
open access

Uranium Concentration Meter

Description: From abstract; "Two basic instruments were developed for determining the concentration of uranium in solutions. Both instruments detect the gamma activity present in a sample solution, and interpret this analysis into direct presentation as parts per million."
Date: September 24, 1956
Creator: Arnett, Orville
Partner: UNT Libraries Government Documents Department
Back to Top of Screen