This system will be undergoing maintenance February 20th between 9:00AM and 12:00PM CST.

Search Results

Primary view of An Addendum to a Parametric Study of the Gas-Cooled Reactor Concept
Hanford Works
March 1, 1958
Primary view of An Alpha, Beta, Gamma Hand and Shoe Counter - Model 2
Spear, W. G.
June 2, 1958
Primary view of An Automatic Analyzing Monitor for Reactor Effluent Cooling Water
Rieck, H. G.; Ratcliffe, C. A. & Schwendiman, L. C.
May 1, 1959
Primary view of Beta-Gamma Dose Rates from U232 in U233
Owen, F. E.
April 1964
Primary view of Construction Completion Report: CAI-816, 100-N Reactor Plant
Buckner, C. L.
October 15, 1964
Primary view of Conversion of UNH to UO3 : Terminal Report
Maness, R. F. & Clagett, F.
January 10, 1951
Primary view of Critical Mass Studies of Plutonium Solutions
Kruesi, F. E.; Erkman, J. O. & Lanning, D. D.
February 15, 1960
Primary view of Description of Purex Plant Process
Irish, E. R.
May 19, 1959
Primary view of Design and Installation of a High Precision Temperature and Intimate Contact Monitor for Experimental Vacuum Chucks
Morrow, G. W.
May 15, 1958
Primary view of Distribution of the Actinide Elements in the Molten System: KCI-AICI3-AI
Moore, R. H. & Lyon, W. L.
October 20, 1959
Primary view of Dual Channel Pulse Analyser and Count-Rate Meter for Gamma Spectrometer Monitor
Paul, R. S. & Wood, M. R.
June 17, 1954
Primary view of Economic Evaluation of a 300-Mw(e) Supercritical Pressure Power Reactor
Harty, H.; Regimbal, J. J.; Toyoda, K. G. & Widrig, R. D.
June 1961
Primary view of Effect of Process Variables on Graphite Purity
Riley, W. C. & Corners, A. M.
July 20, 1954
Primary view of The Effect of Temperature on the Neutron Attenuation of Magnetite Concrete
Wood, D. E.
December 11, 1958
Primary view of Evaluation of Iron- and Nickel-Base Alloys for Medium and High Temperature Reactor Applications, Part 1
Pessl, H. J.
February 1961
Primary view of Fabrication of the PRTR Zircaloy-2 High Pressure Process Tubes
Knecht, R. L.
July 31, 1959
Primary view of Factors Affecting Fluidization of Uranium Trioxide Powders
Johnson, B. M.
March 1, 1958
Primary view of Failure Test of a Double Chambered NaK-Filled Irradiation Capsule
Kosut, B. S.; Leggett, R. D. & Marshall, R. K.
September 1961
Primary view of Filtration of Radioactive Aerosols by Glass Fibers: Part Two -- Appendices
Blasewitz, A. G.; Carlisle, R. V.; Judson, B. F.; Katzer, M. F.; Kurtz, E. F.; Schmidt, W. C. et al.
April 16, 1951
Primary view of Final Design Report: DR-1 Gas Loop
Baars, R. E.
March 1961
Primary view of Final Design Report KAPL-120 High Pressure Recirculating Water Loop
Wade, G. E. & Berberet, J. A.
January 15, 1956
Primary view of Final Report on Design Tests PR-50 and PR-51: Reactor Piping Seal Testing and Reactor Piping Structural Integrity
Jackson, P. M.
June 26, 1959
Primary view of Halogen Collector Test Program
Arthur D. Little, Inc.
March 1, 1960
Primary view of Heat Transfer Calculations for the PRTR Pressurized Gas-Cooled Loop Facility
Muraoka, J.
June 1961
Back to Top of Screen