Search Results

Primary view of Final Design Report KAPL-120 High Pressure Recirculating Water Loop
Wade, G. E. & Berberet, J. A.
January 15, 1956
Primary view of Joint Design for Making Root Pass Welds without Filler Material
Lemon, L. C. & Smith, W. R.
July 9, 1956
Primary view of The Purex process : a Solvent Extraction Reprocessing Method for Irradiated Uranium
Irish, E. R. & Reas, W. H.
April 8, 1957
Primary view of A Martensitic Reaction for Uranium
Bement, A. L. & Wallace, W. P.
June 25, 1957
Primary view of Plating Thickness Tester
Fitch, C. E., Jr.
November 15, 1957
Primary view of Factors Affecting Fluidization of Uranium Trioxide Powders
Johnson, B. M.
March 1, 1958
Primary view of Design and Installation of a High Precision Temperature and Intimate Contact Monitor for Experimental Vacuum Chucks
Morrow, G. W.
May 15, 1958
Primary view of An Alpha, Beta, Gamma Hand and Shoe Counter - Model 2
Spear, W. G.
June 2, 1958
Primary view of The Effect of Temperature on the Neutron Attenuation of Magnetite Concrete
Wood, D. E.
December 11, 1958
Primary view of Trans-Plutonium Isotope Buildup by Neutron Irradiation of Plutonium
Brauer, F. P. & Burley, Helen H.
December 15, 1958
Primary view of An Automatic Analyzing Monitor for Reactor Effluent Cooling Water
Rieck, H. G.; Ratcliffe, C. A. & Schwendiman, L. C.
May 1, 1959
Primary view of Final Report on Design Tests PR-50 and PR-51: Reactor Piping Seal Testing and Reactor Piping Structural Integrity
Jackson, P. M.
June 26, 1959
Primary view of Fabrication of the PRTR Zircaloy-2 High Pressure Process Tubes
Knecht, R. L.
July 31, 1959
Primary view of Distribution of the Actinide Elements in the Molten System: KCI-AICI3-AI
Moore, R. H. & Lyon, W. L.
October 20, 1959
Primary view of Ultrasonic Resin Level Detector
Hunter, D. O. & Pleasance, C. L.
January 15, 1960
Primary view of Pyrophoricity of Uranium in Reactor Environments
Zima, G. E.
January 22, 1960
Primary view of Critical Mass Studies of Plutonium Solutions
Kruesi, F. E.; Erkman, J. O. & Lanning, D. D.
February 15, 1960
Primary view of Halogen Collector Test Program
Arthur D. Little, Inc.
March 1, 1960
Primary view of Specifications for Swaged UO2 19-Rod Cluster, PRTR Fuel Element Mark 1
Millhollen, M. K.
March 15, 1960
Primary view of Plutonium Recycle Test Reactor Final Safeguard Analysis: Supplement 2, Consequences of a Primary Coolant Leak
Wittenbrock, N. G. & Muraoka, J.
November 15, 1960
Primary view of Evaluation of Iron- and Nickel-Base Alloys for Medium and High Temperature Reactor Applications, Part 1
Pessl, H. J.
February 1961
Primary view of Final Design Report: DR-1 Gas Loop
Baars, R. E.
March 1961
Primary view of Plutonium Spike Fuel Elements for the Plutonium Recycle Test Reactor: Part 1 - The Mark 1-G
Freshley, M. D.
March 1961
Primary view of Pneumatic Injection Casting of Aluminum-Plutonium Fuel Elements
Koler, R. K.
April 1961
Back to Top of Screen