Search Results

Primary view of Health and Safety Laboratory Fallout Program Quarterly Summary Report: September 1, 1973 - December 1, 1973, Appendix
U.S. Atomic Energy Commission. Health and Safety Laboratory.
January 1, 1974
Primary view of Health and Safety Laboratory Fallout Program Quarterly Summary Report: September 1, 1971 - December 1, 1971, Appendix
unknown creator
January 1, 1972
Primary view of Health and Safety Laboratory Fallout Program Quarterly Summary Report: September 1, 1970 - December 1, 1970, Appendix
U.S. Atomic Energy Commission. Health and Safety Laboratory.
January 1, 1971
Primary view of Secondary Shutdown Systems of Nuclear Power Plants
Walker, C. S.
January 1966
Primary view of INDEX: a Computer Program for Indexing X-ray Diffraction Powder Patterns
Goebel, J. B. & Wilson, Archie Spencer
January 1965
Primary view of Radiological Aspects of SNAPTRAN 2/10A-3 Destructive Test
Cordes, O. L.; Bird, R. P.; Dinneen, G. A. & Fielding, J. R.
January 1965
Primary view of Chromosomal Aberrations in a Natural Population of Chironomus Tentans Exposed to Chronic Low-Level Environmental Radiation
Blaylock, B. Gordon; Auerbach, S. I. & Nelson, D. J.
January 29, 1964
Primary view of Advanced Test Reactor Burnout Heat Transfer Tests
Croft, M. W.
January 1964
Primary view of Advanced Test Reactor Turbo Report
Turner, Robert A.
January 1964
Primary view of Liquid Metal Fast Breeder Reactor Design Study: Volume 1
General Electric Company
January 1964
Primary view of Liquid Metal Fast Breeder Reactor Design Study: Volume 2
General Electric Company
January 1964
Primary view of A Survey of Water Reactor Primary System Conditions Pertinent to the Study of Pipe Rupture
U.S. Atomic Energy Commission
January 1964
Primary view of Safety Analysis Report : Snaptran 2/10A-1 Safety Tests
Waage, J. M.
January 28, 1963
Primary view of Evaluation of Radiation Stabilizers for Terphenyl by High-Temperature Electron Irradiation
Hartzfeld, H. A. & Regier, R. B.
January 23, 1963
Primary view of Evaluation of Diethers as Uranium Extractants
Googin, J. M.; Harper, W. L.; Phillips, L. R. & Postma, Fred W.
January 14, 1963
Primary view of High-Temperature Irradiation of UOâ‚‚-BeO Bodies
Titus, G. W. & Saling, J. H.
January 1963
Primary view of 30 Megawatt Heat Exchanger and Steam Generator for Sodium Cooled Reactor System
Alco Products (Firm)
January 31, 1962
Primary view of Investigation of 17-4 PH Steel Components Used in SM-1, SM-1A, PM-2A Reactor Plants
Haraway, E. S. & Saccocio, R. M.
January 23, 1962
Primary view of Nuclear Measurements for Type 3 Replacement Cores for SM-1, SM-1A and PM-2A CE 3
Raby, T. M.; Walthousen, L. D.; Kemp, S. N.; McCool, W. J.; Sontheimer, K. C. & Robinson, R. A.
January 11, 1962
Primary view of High Power Density Development Project: Interim Report, 300 MWe HPD Conceptual Design Study
Grayhek, V. G.
January 5, 1962
Primary view of Thermonuclear Project Semiannual Progress Report: for Period Ending July 31, 1960
unknown creator
January 13, 1961
Primary view of Experiments and Analysis for SM-1 Core II With Special Components
Lee, D. H.; Robinson, R. A. & Segalman, I.
January 1, 1961
Primary view of High Power Density Development Project: Third Quarterly Progress Report, October - December, 1960
Holland, L. K.
January 1, 1961
Primary view of Steam-Cooled Power Reactor Evaluation: Study of 300 Mw(e) Once-Through Superheater Reactor
U.S. Atomic Energy Commission
January 1961
Back to Top of Screen