Search Results

Primary view of An Addendum to a Parametric Study of the Gas-Cooled Reactor Concept
Hanford Works
March 1, 1958
Primary view of An Automatic Analyzing Monitor for Reactor Effluent Cooling Water
Rieck, H. G.; Ratcliffe, C. A. & Schwendiman, L. C.
May 1, 1959
Primary view of Description of Developmental Fast Neutron Breeder Power Reactor Plant
Atomic Power Development Associates
September 1, 1955
Primary view of Design Analysis of a Prepackaged Nuclear Power Plant: Volume 1, Primary and Secondary System Design
unknown creator
February 1, 1959
Primary view of Design Analysis of a Prepackaged Nuclear Power Plant: Volume 2, Reactor Design Analysis
unknown creator
February 1, 1959
Primary view of Design, Fabrication, and Irradiation of Superheat Fuel Element SH-4B in VBWR
Spalaris, C. N.; Boyle, R. F.; Evans, T. F. & Esch, E. L.
September 1, 1961
Primary view of Experiments and Analysis for SM-1 Core II With Special Components
Lee, D. H.; Robinson, R. A. & Segalman, I.
January 1, 1961
Primary view of Factors Affecting Fluidization of Uranium Trioxide Powders
Johnson, B. M.
March 1, 1958
Primary view of Halogen Collector Test Program
Arthur D. Little, Inc.
March 1, 1960
Primary view of Hazards Report for Insertion of the PM-1-M-2 Element in the SM-1 Core II
Coombe, J. R.; Scoles, J. F.; Brondel, J. O. & Lee, D. H.
September 1, 1961
Primary view of Hazards Report for Step Transient Loading Tests on the SM-1 : Task XII
Pomeroy, D. L.
February 1, 1962
Primary view of Health and Safety Laboratory Fallout Program Quarterly Summary: March 1, 1974 - June 1, 1974
U.S. Atomic Energy Commission. Health and Safety Laboratory.
July 1, 1974
Primary view of Health and Safety Laboratory Fallout Program Quarterly Summary Report: December 1, 1973 - March 1, 1974
U.S. Atomic Energy Commission. Health and Safety Laboratory.
April 1, 1974
Primary view of Health and Safety Laboratory Fallout Program Quarterly Summary Report: December 1, 1973 - March 1, 1974, Appendix
U.S. Atomic Energy Commission. Health and Safety Laboratory.
April 1, 1974
Primary view of Health and Safety Laboratory Fallout Program Quarterly Summary Report: June 1, 1965 - September 1, 1965
Hardy, Edward P., Jr. & Rivera, Joseph
October 1, 1965
Primary view of Health and Safety Laboratory Fallout Program Quarterly Summary Report: March 1, 1974 - June 1, 1974, Appendix
U.S. Atomic Energy Commission. Health and Safety Laboratory.
July 1, 1974
Primary view of Health and Safety Laboratory Fallout Program Quarterly Summary Report: September 1, 1970 - December 1, 1970, Appendix
U.S. Atomic Energy Commission. Health and Safety Laboratory.
January 1, 1971
Primary view of Health and Safety Laboratory Fallout Program Quarterly Summary Report: September 1, 1971 - December 1, 1971, Appendix
unknown creator
January 1, 1972
Primary view of Health and Safety Laboratory Fallout Program Quarterly Summary Report: September 1, 1973 - December 1, 1973, Appendix
U.S. Atomic Energy Commission. Health and Safety Laboratory.
January 1, 1974
Primary view of Heat Transfer Coefficients with Annular Flow During "One-Through" Boiling Water to 100 Per Cent Quality at 800, 1100, 1400 PSI
Polomik, E. E.; Levy, S. & Sawochka, S. G.
May 1, 1961
Primary view of High-Frequency Voltage Measurement
Selby, Myron C.
September 1, 1949
Primary view of High Power Density Development Project: Third Quarterly Progress Report, October - December, 1960
Holland, L. K.
January 1, 1961
Primary view of The Influence of Design and Production Parameters on Fabrication Costs of Nuclear Reactor Fuel Elements
Stein, P. E.; Ayers, A. C.; Braatz, R. J.; Bradford, C. M.; Holt, V. D. & Mattie, G. P.
November 1, 1961
Primary view of A Method for Evaluation of Multiple Scattering Effects in Charged Particle Experiments
Dickinson, W. C. & Dodder, D. C.
December 1, 1950
Back to Top of Screen